Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Nb Palm

Nb Palm is an approved residential project in Bhadaj, Daskroi, Ahmadabad, Gujarat. The site covers 1.3 acres. Its stated project cost is ₹202.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 23 Feb 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since23 Feb 2026
Application filed27 Nov 2025
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorBuildings & townships
ApplicantBharwad Ramubhai Surabhai
UseResidential
Land area1.3 acres (0.5 ha)
Project cost₹202.4 crore
Village / localityBhadaj
Taluk / tehsilDaskroi
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-07041

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 27 Nov 2025 (this page)Environmental approval granted1.3 acres₹202.4 crore
New project filed 27 Feb 2025Environmental approval granted1.3 acres₹202.4 crore

What the filings say

What is planned

NB Palm is a residential building project proposed by Bharwad Ramubhai Surabhai in Bhadaj, Ahmadabad. According to the environmental clearance granted in July 2025, the project involves the construction of two residential blocks, Block A and Block B. Both buildings are planned to have three basements, a ground floor or hollow plinth, and 21 upper floors. The maximum height of the buildings is set at 82.17 metres.

The project is designed to accommodate 136 residential units. The layout plan indicates that Block A will contain 58 units and Block B will contain 78 units. The total built-up area for the project is 55,947.28 square metres.

Layout and design

The project layout includes a peripheral margin of 8 metres and internal roads with a width of 8.10 metres. Separate entry and exit points are planned for the project site. The ground floor and hollow plinth areas are designated for parking and common amenities. The layout includes a common plot area of 552.55 square metres.

Water, power and access

During the construction phase, the applicant expects to use 25 kilolitres per day (KLD) of water, which will be supplied via tankers. For the operation phase, the total water requirement is estimated at 152.83 KLD. Of this, 99.96 KLD will be fresh water supplied by the Ahmedabad Municipal Corporation (AMC), while the remaining 52.87 KLD will be met through treated sewage from an onsite treatment plant.

Power for the project will be sourced from the local grid, with a 625 KVA diesel generator (DG) set planned for emergency backup. The project also incorporates renewable energy, with a commitment to generate 159 KW through solar power installations.

Parking is planned across three basement levels and the hollow plinth, providing a total of 12,174.45 square metres of space, which is intended to accommodate 388 equivalent car spaces (CPS). The basements are designed with a height of at least 4.5 metres to allow for future mechanical parking systems.

Environmental safeguards

The applicant has proposed an onsite Sewage Treatment Plant (STP) with a capacity to treat 114.24 KLD of sewage. A dual plumbing system will be installed to reuse treated water for flushing and gardening. For solid waste, an organic waste converter will be used to process biodegradable waste, while recyclable materials will be sold to vendors.

Stormwater management includes two percolation wells for groundwater recharge. The project also plans for a green belt area of 841.99 square metres, which will include 153 trees. Energy conservation measures include the use of LED lighting, energy-efficient motors, and thermal insulation for the roof.

ItemDetail
Total Built-up Area55,947.28 sq. m.
Total Residential Units136
Maximum Building Height82.17 m
Total Parking Area12,174.45 sq. m.
Fresh Water Requirement99.96 KLD
Sewage Generation114.24 KLD
Solar Power Generation159 KW
Green Belt Area841.99 sq. m.

Nb Palm site plan and layout

A drawing from the project's filings. Sign in free to see it.

Nb Palm: Layout plan: building blocks, internal roads, and parking areas (preview)🔒 Sign in free to see it
Layout plan: building blocks, internal roads, and parking areas

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 65% of them.

213 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhadaj, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.