One of 2 filings for this project. The project's main page, with every filing and where each stands: Nb Palm
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jul 2025 |
| Application filed | 27 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Bharwad Ramubhai Surabhai |
| Use | Residential |
| Units | 136 |
| Towers | 2 |
| Floors (tallest) | 21 |
| Basements | 3 |
| Height | 82 m |
| Parking spaces | 388 |
| Land area | 1.3 acres (0.5 ha) |
| Built-up area | 55,947 m² (6,02,208 sq ft) |
| Plot area | 5,265 m² (56,672 sq ft) |
| Project cost | ₹202.4 crore |
| Village / locality | Bhadaj |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07351 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 27 Nov 2025 | Environmental approval granted | 1.3 acres | ₹202.4 crore |
| New project filed 27 Feb 2025 (this page) | Environmental approval granted | 1.3 acres | ₹202.4 crore |
What the filings say
What is planned
NB Palm is a residential building project proposed by Bharwad Ramubhai Surabhai in Bhadaj, Ahmadabad. According to the environmental clearance granted in July 2025, the project involves the construction of two residential blocks, Block A and Block B. Both buildings are planned to have three basements, a ground floor or hollow plinth, and 21 upper floors. The maximum height of the buildings is set at 82.17 metres.
The project is designed to accommodate 136 residential units. The layout plan indicates that Block A will contain 58 units and Block B will contain 78 units. The total built-up area for the project is 55,947.28 square metres.
Layout and design
The project layout includes a peripheral margin of 8 metres and internal roads with a width of 8.10 metres. Separate entry and exit points are planned for the project site. The ground floor and hollow plinth areas are designated for parking and common amenities. The layout includes a common plot area of 552.55 square metres.
Water, power and access
During the construction phase, the applicant expects to use 25 kilolitres per day (KLD) of water, which will be supplied via tankers. For the operation phase, the total water requirement is estimated at 152.83 KLD. Of this, 99.96 KLD will be fresh water supplied by the Ahmedabad Municipal Corporation (AMC), while the remaining 52.87 KLD will be met through treated sewage from an onsite treatment plant.
Power for the project will be sourced from the local grid, with a 625 KVA diesel generator (DG) set planned for emergency backup. The project also incorporates renewable energy, with a commitment to generate 159 KW through solar power installations.
Parking is planned across three basement levels and the hollow plinth, providing a total of 12,174.45 square metres of space, which is intended to accommodate 388 equivalent car spaces (CPS). The basements are designed with a height of at least 4.5 metres to allow for future mechanical parking systems.
Environmental safeguards
The applicant has proposed an onsite Sewage Treatment Plant (STP) with a capacity to treat 114.24 KLD of sewage. A dual plumbing system will be installed to reuse treated water for flushing and gardening. For solid waste, an organic waste converter will be used to process biodegradable waste, while recyclable materials will be sold to vendors.
Stormwater management includes two percolation wells for groundwater recharge. The project also plans for a green belt area of 841.99 square metres, which will include 153 trees. Energy conservation measures include the use of LED lighting, energy-efficient motors, and thermal insulation for the roof.
| Item | Detail |
|---|---|
| Total Built-up Area | 55,947.28 sq. m. |
| Total Residential Units | 136 |
| Maximum Building Height | 82.17 m |
| Total Parking Area | 12,174.45 sq. m. |
| Fresh Water Requirement | 99.96 KLD |
| Sewage Generation | 114.24 KLD |
| Solar Power Generation | 159 KW |
| Green Belt Area | 841.99 sq. m. |
Nb Palm site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 65% of them.
213 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhadaj, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nb Palm — environmental approval granted, 0 m away
- Proposed Residential and Commercial (Essential Shops) Project - "Aurelius" — environmental approval granted, 100 m away
- Four Seasons Residency — environmental approval granted, 200 m away
- Four Seasons Residency — environmental approval granted, 200 m away
- Four Seasons Residency — environmental approval granted, 200 m away
- The Camellia — environmental approval granted, 200 m away
- Anantara Imperial — environmental approval granted, 200 m away
- Proposed Residential Project - "Palm Iconiq" — environmental approval granted, 200 m away