Quick answers
What is this project?
Proposed Petrochemical Complex at Notified SEZ Area of APSEZL, Taluka Mundra, District Kutch, Gujarat is a proposed industrial project in Jarpara, Mundra, Kachchh, Gujarat. The site covers 4,266.8 acres.
Who is building it?
The applicant is Adani Petrochemicals Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 Apr 2026), as of 27 Nov 2026.
Where is it?
In Jarpara, Mundra, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1,00,000 crore and a site of 4,266.8 acres.
When was it filed?
The application was filed on 7 Feb 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Apr 2026 |
| Application filed | 7 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Adani Petrochemicals Limited |
| Land area | 4,266.8 acres (1,726.7 ha) |
| Project cost | ₹1,00,000 crore |
| Village / locality | Jarpara |
| Taluk / tehsil | Mundra |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07061 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4,266.8 acres, this one is larger than 97% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jarpara, Mundra, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to APSEZ Optimizes Mundra Port Waterfront in Kachchh for 514-Million-Tonne Capacity (11.2 km away).
Other projects nearby
- 125 & 63 MM Dia PE Gas Pipeline For SH-6 Gundala Road and SH-48 Shaktinagar to… — forest land use approved, 1.7 km away
- Industrial project by M/s. Shital Metallics and Additives LLP. — environmental approval granted, 1.7 km away
- Industrial project by M/s. Shital Metallics and Additives LLP. — environmental approval granted, 1.7 km away
- Diversion of 0.00425 Ha Road Side Protected Forest Land of Bhuj-Mundra Road… — forest land use approved, 2 km away
- 125/ 63mm Dia PE Pipeline For Mundra, Old Bandar Road and Nana Kapaya Jindal… — lapsed, 2.1 km away
- Industrial project by M/s. Dorf-Ketal Chemicals India Limited — environmental approval granted, 2.6 km away
- PROPOSED EXPANSION IN MANUFACTURING OF SPECIALITY CHEMICALS AND ADDITION OF… — cleared for impact study, 2.6 km away
- 125mm Dia PE GAS PIPELINE Connectivity From Port Colony To Railway Crossing… — forest land use approved, 3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.