What is One 33 by Stalwart?
One 33 by Stalwart is an approved mixed-use project in Gaviyar, Majura, Surat, Gujarat. It plans 138 units in 3 towers of up to 12 floors on 1.5 acres.
Who is building it?
The applicant is Stalwart Estates.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 May 2026), as of 27 Nov 2026.
Where is it?
In Gaviyar, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹66.4 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 31 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 May 2026 |
| Application filed | 31 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Stalwart Estates |
| Use | Mixed use |
| Units | 138 |
| Towers | 3 |
| Floors (tallest) | 12 |
| Basements | 2 |
| Parking spaces | 256 |
| Land area | 1.5 acres (0.6 ha) |
| Built-up area | 38,384 m² (4,13,162 sq ft) |
| Plot area | 6,048 m² (65,100 sq ft) |
| Project cost | ₹66.4 crore |
| Village / locality | Gaviyar |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07481 |
What the filings say
What is planned
Stalwart Estates proposes to develop a residential cum commercial building project named "One 33 by Stalwart" on a plot of 6,048.00 square metres (1.49 acres). The applicant's project report describes a development consisting of three residential blocks and one residential cum commercial building, all reaching 12 floors above two basement levels and a hollow plinth.
The project is designed to accommodate 116 residential units and 22 commercial units. The total built-up area is specified as 38,384.14 square metres. Planned amenities include a children's play area, a garden with a jogging park, a clubhouse, a banquet hall, and an indoor games room.
Key Figures
| Item | Detail |
|---|---|
| Total Plot Area | 6,048.00 sq. mt. |
| Total Built-up Area | 38,384.14 sq. mt. |
| Residential Units | 116 |
| Commercial Units | 22 |
| Tallest Building Height | 41.86 metres |
| Total Parking Area | 8,050.11 sq. mt. |
| Power Demand | 700 KW |
| Expected Residents | 844 |
Layout and design
The site layout features four distinct towers (A, B, C, and D). Tower A and Tower B are residential, while Towers C and D are part of the residential cum commercial block. The ground floor is dedicated to commercial shops and building foyers.
Parking is distributed across two basement levels, the hollow plinth, and open surface areas. The project provides a total of 256 Equivalent Car Spaces (ECS), exceeding the required 158 ECS. This includes 52 designated parking points for electric vehicle charging.
Land and surroundings
The project site is located at Revenue Survey No. 272/2, Final Plot No. 133/2 in Gaviyar, Surat. The land is classified as private residential land. The site is situated approximately 1.03 km from Surat Airport and 14.32 km from Surat railway station. The applicant states that no national parks or wildlife sanctuaries are within a 10 km radius.
Water, power and access
Water for the project will be supplied by the Surat Municipal Corporation (SMC). During the operation phase, the total water requirement is estimated at 113 kilolitres per day (KLD), of which 66 KLD will be fresh water and 47 KLD will be recycled treated wastewater.
Power will be sourced from Dakshin Gujarat Vij Company Limited (DGVCL) with a maximum demand of 700 KW. For backup, two silent diesel generator sets of 250 KVA each are proposed. The project also includes a solar power system with 130 panels (70 kW capacity) to power street lighting and common areas.
Access to the site is provided via two gates from adjacent public roads of 24-metre and 18-metre widths.
Environmental safeguards
The applicant proposes to install a Sewage Treatment Plant (STP) with a capacity of 110 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing (44 KLD) and gardening (3 KLD).
Solid waste management includes an Organic Waste Convertor (OWC) with a capacity of 250 kg/day to process kitchen waste into manure. Inorganic waste will be collected by the SMC waste collection system. For rainwater management, two percolation wells reaching a depth of 40 metres are planned. A green belt area of 650 square metres is proposed, with plans to plant 151 trees of species such as Gulmohar, Jambu, and Badam.
Timeline
The applicant submitted a notarized undertaking on December 15, 2025, stating that no construction activity had started at the site as of that date. Environmental approval for the project was granted on May 7, 2026.
Stalwart One 33 site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.5 acres, this one is smaller than 51% of them.
71 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gaviyar, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Cannon Lakeview — environmental approval granted, 300 m away
- Cannon Lakeview — withdrawn, 300 m away
- Sangini Lakewoods — environmental approval granted, 300 m away
- Vacanza Aurum — environmental approval granted, 750 m away
- Avadh Onella — environmental approval granted, 1 km away
- Wealth City — environmental approval granted, 1.1 km away
- Residential Building Project by Jagamal Bhatu — environmental approval granted, 1.2 km away
- "residential Cum Commercial Project" by Mr. Manojbhai A. Gandhi — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.