One of 2 filings for this project. The project's main page, with every filing and where each stands: Shri Hematbhai Rambhai Ambaliya
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 15 Sept 2025 |
| Application filed | 30 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ambaliya hematbhai |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Sukhpar |
| Taluk / tehsil | Halvad |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07523 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Aug 2025 | Environmental approval granted | 2.5 acres | ₹1.7 crore |
| Early planning filed 30 Jun 2025 (this page) | Returned to applicant | 2.5 acres | ₹1.7 crore |
In context
263 applications in Morbi since January 2022 are in the same category (Mining): 184 approved, 24 filed or under review, and 55 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Sukhpar, Halvad, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Hematbhai Rambhai Ambaliya — environmental approval granted, 0 m away
- Ambaliya Hematbhai — cleared for impact study, 0 m away
- "proposed Expansion in Existing Decorative Laminate Sheets Manufacturing Unit… — cleared for impact study, 5.5 km away
- LILO-1 & LILO-2 of Lakadia – Ahmedabad 765kV D/C Transmission Line at Halvad… — forest land use approved, 5.9 km away
- Proposed 60 KLD Grain Based Ethanol plant by M/s PRISM ADVANCE TECHNOLOGY… — environmental approval granted, 6.5 km away
- Industrial project by M/s. Shree Khodiyar Salt Merchant — environmental approval granted, 7.8 km away
- Shri Nileshbhai Raiyabhai Goltar Re-appraisal Area-1.21.60Survey no. – 87/1… — lapsed, 9.5 km away
- Shri Vinodbhai Raiyabhai Goltar Re-appraisal Area-2.68.05 Survey no. – 87/1… — not approved, 9.5 km away
More from Ambaliya hematbhai in Morbi
- Ambaliya Hematbhai — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.