Project details
| Official title | Construction of LILO-1 & LILO-2 of Lakadia – Ahmedabad 765kV D/C Transmission Line at Halvad for "Evacuation of additional 7 GW of RE power from Khavda RE park under Phase III Part A " |
|---|---|
| Status | Forest land use approved |
| Status since | 6 May 2025 |
| Application filed | 16 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Adani Transmission Step-Five Limited |
| Land area | 561 acres (227 ha) |
| Forest land | 3,760 m² |
| Project cost | ₹118.6 crore |
| Village / locality | Ghanshyampur |
| Taluk / tehsil | Halvad |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12172 |
In context
23 applications in Morbi since January 2022 are in the same category (Power): 15 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 561 acres, this one is larger than 94% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghanshyampur, Halvad, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "proposed Expansion in Existing Decorative Laminate Sheets Manufacturing Unit… — cleared for impact study, 400 m away
- Proposed 60 KLD Grain Based Ethanol plant by M/s PRISM ADVANCE TECHNOLOGY… — environmental approval granted, 2.2 km away
- Industrial project by M/s. Shree Khodiyar Salt Merchant — environmental approval granted, 2.6 km away
- Shri Hematbhai Rambhai Ambaliya — environmental approval granted, 5.9 km away
- Shri Hematbhai Rambhai Ambaliya — returned to applicant, 5.9 km away
- Ambaliya Hematbhai — cleared for impact study, 5.9 km away
- Shri Nileshbhai Raiyabhai Goltar Re-appraisal Area-1.21.60Survey no. – 87/1… — lapsed, 9 km away
- Shri Vinodbhai Raiyabhai Goltar Re-appraisal Area-2.68.05 Survey no. – 87/1… — not approved, 9 km away
More from Adani Transmission Step-Five Limited in Morbi
- 765 kV D/C Transmission Line from Khavda-II PS (GIS) to Halvad for "Evacuation… — coastal clearance granted
- 765 kV D/C Transmission Line from Khavda-II PS (GIS) to Halvad for "Evacuation… — forest land use approved
3 Adani Transmission Step-Five projects in Morbi
All 5 Adani Transmission Step-Five projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.