What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Gandhinagar, Gujarat

The Bellissimo

The Bellissimo is an approved residential project in Adalaj (Ct), Gandhinagar, Gujarat. It plans 76 units in 1 tower of up to 19 floors on 0.9 acres. Its stated project cost is ₹52.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Oct 2025).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is The Bellissimo?

The Bellissimo is an approved residential project in Adalaj (Ct), Gandhinagar, Gujarat. It plans 76 units in 1 tower of up to 19 floors on 0.9 acres.

Who is building it?

The applicant is Shree Shakti Projects.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 4 Oct 2025), as of 27 Nov 2026.

Where is it?

In Adalaj (Ct), Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹52.1 crore and a site of 0.9 acres.

When was it filed?

The application was filed on 12 Jun 2025.

Project details

StatusEnvironmental approval granted
Status since4 Oct 2025
Application filed12 Jun 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantShree Shakti Projects
UseResidential
Units76
Towers1
Floors (tallest)19
Basements3
Parking spaces204
Land area3,800 m²
Built-up area29,778 m² (3,20,527 sq ft)
Plot area3,802 m² (40,924 sq ft)
Project cost₹52.1 crore
Village / localityAdalaj (Ct)
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-07658

What the filings say

What is planned

Shree Shakti Projects proposes a new residential building project named "The Bellissimo" in Adalaj, Gandhinagar. The applicant's project report describes a single building block (Block A) consisting of three basement levels, a ground floor (hollow plinth), and 19 upper floors.

The project is designed to house 76 residential units, specifically 4 BHK flats. The total built-up area is 29,778.06 square metres, with a total Floor Space Index (FSI) area of 15,202.92 square metres.

ItemDetail
Total Plot Area3,802.00 sq. mt.
Total Built-up Area29,778.06 sq. mt.
Total FSI Area15,202.92 sq. mt.
Number of Residential Units76 (4 BHK)
Building Configuration3 Basements + Ground + 19 Floors
Total Parking Area6,422.47 sq. mt.
Greenbelt Area540.2 sq. mt.

Layout and design

The building layout includes three basement levels dedicated to parking. The ground floor is designed as a hollow plinth for additional parking and entry. The residential units are distributed across 19 floors. The design incorporates six lifts, including one designated as a fire lift with a 16-passenger capacity.

Architectural features include the use of non-reflective (absorptive) float glass for the facade to minimize heat reflection. Common areas such as staircases and foyers will utilize Light Emitting Diode (LED) lighting to reduce energy consumption. The project also includes a dedicated space for a Diesel Generator (DG) set and a community bin area for waste collection.

Land and surroundings

The project site is located on Final Plot No. 2 of Revenue Survey No. 1005/P in Adalaj, Gandhinagar. It is situated within the limits of the Gandhinagar Urban Development Authority (GUDA). The land is currently open and undeveloped. The site is bounded by an 18-metre wide Town Planning Scheme (TPS) road. A GAIL pipeline is noted near the building control line. The nearest railway station is Sabarmati, approximately 5.70 km away, and Ahmedabad Airport is about 8.30 km from the site.

Water, power and access

During the operational phase, the total water requirement is estimated at 91 kilolitres per day (KLD). Fresh water, sourced from the Narmada supply via GUDA, will account for 62 KLD from the second day onwards. The remaining 29 KLD will be met through treated wastewater reused for flushing (26 KLD) and gardening (3 KLD).

Power will be sourced from Uttar Gujarat Vij Company Limited (UGVCL). The construction phase requires approximately 25-30 kW, while the operational phase will require 1.50 MW. Access to the site is provided via the 18-metre wide TPS road, with internal 6-metre to 8-metre wide approach roads and a 1:12 pedestrian ramp.

Environmental safeguards

The applicant proposes several measures to manage environmental impact:

Timeline

The project documents indicate that construction will utilize local workers, and no on-site housing for labourers is planned. Construction materials required include approximately 17,000 MT of steel, 15,000 bags of cement, and 25,000 MT of sand.

The Bellissimo site plan and layout

3 drawings from the project's filings. Sign in free to see them.

The Bellissimo: Site layout plan showing building footprint, roads, and common plots (preview)🔒 Sign in free to see it
Site layout plan showing building footprint, roads, and common plots
The Bellissimo: Key plan showing project location and surrounding road network (preview)🔒 Sign in free to see it
Key plan showing project location and surrounding road network
The Bellissimo: Technical drawing of the proposed percolation well for rainwater harvesting (preview)🔒 Sign in free to see it
Technical drawing of the proposed percolation well for rainwater harvesting

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 86% of them.

206 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Adalaj (Ct), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.