The Amore

The Amore is an approved mixed-use project in Adalaj (Ct), Gandhinagar, Gujarat. It plans 336 units in 5 towers of up to 13 floors on 2.8 acres. Its stated project cost is ₹101.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 30 Oct 2026).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is The Amore?

The Amore is an approved mixed-use project in Adalaj (Ct), Gandhinagar, Gujarat. It plans 336 units in 5 towers of up to 13 floors on 2.8 acres.

Who is building it?

The applicant is Shyamtulsi Infra LLP.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 30 Oct 2026), as of 27 Nov 2026.

Where is it?

In Adalaj (Ct), Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹101.5 crore and a site of 2.8 acres.

When was it filed?

The application was filed on 11 Apr 2026.

Project details

StatusEnvironmental approval granted
Status since30 Oct 2026
Application filed11 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantShyamtulsi Infra LLP
UseMixed use
Units336
Towers5
Floors (tallest)13
Basements2
Height45 m
Parking spaces728
Land area2.8 acres (1.1 ha)
Built-up area81,294 m² (8,75,040 sq ft)
Plot area11,446 m² (1,23,204 sq ft)
Project cost₹101.5 crore
Village / localityAdalaj (Ct)
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-10451

What the filings say

What is planned

The Amore is a proposed residential and commercial development comprising eight blocks, designated as Blocks A through H. According to the applicant's layout plans, the project will provide a total of 336 units. This includes 308 residential apartments and 28 commercial shops located on the ground floor.

The buildings are designed with two basement levels and a hollow plinth for parking. The residential blocks rise to 13 floors above the ground level. The distribution of units across the blocks is as follows:

Layout and design

The project site includes a central common plot area of 1,439.96 square metres (0.35 acres). The layout features internal approach roads with widths of 6.0 metres and 7.5 metres. The design incorporates 16 lifts across the complex, including 10-person capacity lifts and dedicated fire lifts.

A geotechnical investigation conducted in June 2024 involved drilling three boreholes to a depth of 9.0 metres. The soil profile consists of yellowish brown sandy clays of low plasticity up to 2.30 metres, followed by clayey sand with gravels up to 4.30 metres, and clays of low to intermediate plasticity at deeper levels. Ground water was not encountered within the 9.0-metre investigation depth.

Water, power and access

The total water requirement for the project is estimated at 305.69 kilolitres per day (KLD). The applicant expects to source 207.44 KLD of fresh water from the local authority, while 98.25 KLD will be met through recycled treated wastewater. The project is estimated to generate 239.376 KLD of wastewater during its operation phase.

Power will be sourced from the state grid. The applicant proposes to install roof-top solar energy systems to meet a minimum of 5% of the connected load or 20W per square foot of available roof space. Dedicated electric meter rooms are planned for each block. Access to the development is provided via an 18.0-metre wide Town Planning Scheme (TPS) road and a 12.0-metre wide service road.

Environmental safeguards

The project will include an on-site Sewage Treatment Plant (STP) with a capacity of 275 KLD. Treated water will be reused for flushing and landscaping, with any surplus discharged into the municipal sewer line. For storm water management, three percolation wells will be developed for groundwater recharge, with an estimated annual recharge potential of 5,100 cubic metres.

The greenbelt plan involves planting 287 trees. This will be carried out in two phases: the first phase involves planting evergreen trees at 3.0-metre intervals, and the second phase, starting 18 months later, will add a second row of trees at 6.0-metre intervals. Solid waste will be segregated, with organic waste processed in an on-site organic waste converter.

ItemDetail
Total Units336
Residential Units308
Commercial Units28
Tallest Building Height13 Floors
STP Capacity275 KLD
Total Water Requirement305.69 KLD
Fresh Water Requirement207.44 KLD
Planned Trees287
Percolation Wells3
Common Plot Area1,439.96 sq. m.

The Amore site plan and layout

4 drawings from the project's filings. Sign in free to see them.

The Amore: Layout plan: blocks, parking, roads and unit tables (preview)🔒 Sign in free to see it
Layout plan: blocks, parking, roads and unit tables
The Amore: Location map: project site and surrounding landmarks (preview)🔒 Sign in free to see it
Location map: project site and surrounding landmarks
The Amore: Bore log: soil stratification and investigation data (preview)🔒 Sign in free to see it
Bore log: soil stratification and investigation data
The Amore: Rainwater harvesting: harvesting pit and desilting chamber details (preview)🔒 Sign in free to see it
Rainwater harvesting: harvesting pit and desilting chamber details

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.8 acres, this one is larger than 88% of them.

203 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Adalaj (Ct), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shyamtulsi Infra LLP in Gandhinagar

All 3 Shyamtulsi Infra projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.