Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Sept 2025 |
| Application filed | 29 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Narottam Amichanddas Patel |
| Use | Mixed use |
| Units | 189 |
| Towers | 2 |
| Floors (tallest) | 23 |
| Basements | 2 |
| Parking spaces | 216 |
| Land area | 1.8 acres (0.7 ha) |
| Built-up area | 30,950 m² (3,33,143 sq ft) |
| Plot area | 4,006 m² (43,120 sq ft) |
| Village / locality | Ambli |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07775 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 28 May 2026 | Environmental approval granted | 1.8 acres | |
| New project filed 29 Mar 2025 (this page) | Environmental approval granted | 1.8 acres |
What the filings say
What is planned
Rashmi Melliore is a mixed-use residential and commercial construction project proposed by Narottam Amichanddas Patel. According to the environmental approval documents, the project is planned on a plot area of 4,006 square metres (0.99 acres) with a total built-up area of 30,949.77 square metres.
The development will consist of two buildings with the following configurations:
- Block A: Two basements, a ground floor/hollow plinth, and 22 floors.
- Block B: Two basements, a ground floor/hollow plinth, and 23 floors.
The project includes a total of 176 residential units and 13 commercial units. The commercial components are planned for the lower levels, including five shops on the ground floor of Block A.
Layout and design
The layout plan indicates a 6.00-metre wide approach road leading to the site. Internal movement is facilitated by 8.00-metre wide fire tender van routes surrounding the buildings. The design incorporates a common plot area of 401.05 square metres.
Vertical transport includes seven passenger lifts and two fire lifts across the two blocks. Block A is equipped with four lifts (including one fire lift), while Block B is equipped with three lifts (including one fire lift). The buildings are designed with two staircases each, with a travel distance of 25 metres.
Parking is planned across two basement levels, the hollow plinth, and open areas, providing a total capacity for 216 cars (6,799.52 square metres). The applicant has committed to providing electric charging points for 20% of the parking spaces.
Water, power and access
During the operation phase, the total water requirement is estimated at 151.96 kilolitres per day (KLD). Of this, 98.26 KLD will be fresh water, and 53.70 KLD will be met through treated sewage. For the construction phase, water demand is limited to 27.5 KLD, to be supplied by tankers.
Power will be sourced from the local grid, with a 625 KVA diesel generator set proposed for backup. Energy conservation measures include the installation of 61 KW solar power generation, the use of LED lighting, and architectural designs to maximize natural light.
Environmental safeguards
The applicant proposes to install an onsite Sewage Treatment Plant (STP) with a capacity of 150 KLD. Treated wastewater will be reused for flushing and gardening via a dual plumbing system. For solid waste, an onsite Organic Waste Convertor will process biodegradable waste, while recyclables will be sold to vendors.
To manage stormwater, the project includes two percolation wells for groundwater recharging. The green belt will cover 650.26 square metres (approximately 10% of the plot), featuring 101 trees. Dust mitigation during construction will involve 10-metre high wind-breakers and regular water sprinkling.
Timeline
The applicant has allocated ₹177 lakh for Corporate Environmental Responsibility (CER) activities, which are scheduled to be implemented over a period of three years following the commissioning of the project.
Rashmi Melliore site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is larger than 57% of them.
310 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambli, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rashmi Melliore — environmental approval granted, 0 m away
- Sun Urban Park — environmental approval granted, 50 m away
- Sun Urban Park — environmental approval granted, 50 m away
- Sun Urban Park — environmental approval granted, 50 m away
- The Connect — environmental approval granted, 200 m away
- Ambli T Junction — environmental approval granted, 250 m away
- Proposed Commercial Project "The Citadel" — environmental approval granted, 350 m away
- Proposed Commercial Project "The Showcase" — environmental approval granted, 450 m away