Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Jul 2026 |
| Application filed | 28 May 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Buildings & townships |
| Applicant | Narottam Amichanddas Patel |
| Use | Residential |
| Land area | 1.8 acres (0.7 ha) |
| Village / locality | Ambli |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10255 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 28 May 2026 (this page) | Environmental approval granted | 1.8 acres | |
| New project filed 29 Mar 2025 | Environmental approval granted | 1.8 acres |
What the filings say
What is planned
Rashmi Melliore is a proposed residential and commercial building project by Narottam Amichanddas Patel. The applicant's project report states that the development will be situated on a plot area of 4,006 square metres, with a total built-up area of 30,949.77 square metres.
The project consists of two buildings (Blocks A and B) with the following configuration:
- Block A: 2 basements, a ground floor/hollow plinth, and 22 floors.
- Block B: 2 basements, a ground floor/hollow plinth, and 23 floors.
The development will provide a total of 176 residential units and 13 commercial units. The commercial components are planned for the lower levels, including shops on the ground floor.
Layout and design
The layout plan indicates a 6.00-metre wide approach road leading to the site. Internal circulation includes an 8.00-metre wide fire tender van route. The project includes a dedicated common plot area of 401.05 square metres.
Vertical transport will be managed by multiple lifts in each block. Block A is designed with four lifts (including one fire lift), while Block B is designed with three lifts (including one fire lift). The buildings will feature refuge areas at the 4th, 6th, 11th, and 16th floors for safety.
Land and surroundings
The project is located at Final Plot No. 9, Town Planning Scheme No. 204 (Sarkhej-Okaf-Makarba-Vejalpur-Ambli), in Ambli village, Ahmedabad. The land is classified as non-agricultural for multi-purpose use. The site is bounded by a 60.00-metre wide S.P. Ring Road and 12.00-metre wide roads on other sides.
Water, power and access
During the construction phase, the fresh water requirement is estimated at 27.5 kilolitres per day (KLD), to be supplied by tankers. For the operation phase, the total water requirement is projected at 151.96 KLD. Of this, 98.26 KLD will be fresh water, while 53.70 KLD will be met through treated sewage for flushing and gardening.
Power will be sourced from the local grid. A diesel generator (DG) set of 625 kVA is proposed for emergency backup. The applicant plans to install 61 kW of solar power generation as part of energy conservation measures.
Environmental safeguards
The applicant proposes to install an onsite Sewage Treatment Plant (STP) with a capacity of 150 KLD. Treated wastewater will be reused within the premises. For solid waste, biodegradable waste will be processed in an onsite organic waste converter, while recyclable materials will be sold to vendors.
Rainwater harvesting will be implemented through two percolation wells. The green belt will cover 650.26 square metres (approximately 10% of the plot area), including the plantation of 101 trees. Dust mitigation measures, such as windbreakers up to 10 metres high and water sprinkling, are planned for the construction phase.
Key figures
| Item | Detail |
|---|---|
| Plot Area | 4,006 sq. m. |
| Total Built-up Area | 30,949.77 sq. m. |
| FSI Area | 16,782.97 sq. m. |
| Residential Units | 176 |
| Commercial Units | 13 |
| Total Parking Space | 6,799.52 sq. m. (216 CPS) |
| STP Capacity | 150 KLD |
| Solar Power Generation | 61 kW |
| CER Allocation | ₹1.77 crore |
Rashmi Melliore site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is larger than 57% of them.
310 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambli, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rashmi Melliore — environmental approval granted, 0 m away
- Sun Urban Park — environmental approval granted, 50 m away
- Sun Urban Park — environmental approval granted, 50 m away
- Sun Urban Park — environmental approval granted, 50 m away
- The Connect — environmental approval granted, 200 m away
- Ambli T Junction — environmental approval granted, 250 m away
- Proposed Commercial Project "The Citadel" — environmental approval granted, 350 m away
- Proposed Commercial Project "The Showcase" — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.