What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Rashmi Melliore

Rashmi Melliore is an approved residential project in Ambli, Daskroi, Ahmadabad, Gujarat. The site covers 1.8 acres. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Jul 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since21 Jul 2026
Application filed28 May 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorBuildings & townships
ApplicantNarottam Amichanddas Patel
UseResidential
Land area1.8 acres (0.7 ha)
Village / localityAmbli
Taluk / tehsilDaskroi
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-10255

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 28 May 2026 (this page)Environmental approval granted1.8 acres
New project filed 29 Mar 2025Environmental approval granted1.8 acres

What the filings say

What is planned

Rashmi Melliore is a proposed residential and commercial building project by Narottam Amichanddas Patel. The applicant's project report states that the development will be situated on a plot area of 4,006 square metres, with a total built-up area of 30,949.77 square metres.

The project consists of two buildings (Blocks A and B) with the following configuration:

The development will provide a total of 176 residential units and 13 commercial units. The commercial components are planned for the lower levels, including shops on the ground floor.

Layout and design

The layout plan indicates a 6.00-metre wide approach road leading to the site. Internal circulation includes an 8.00-metre wide fire tender van route. The project includes a dedicated common plot area of 401.05 square metres.

Vertical transport will be managed by multiple lifts in each block. Block A is designed with four lifts (including one fire lift), while Block B is designed with three lifts (including one fire lift). The buildings will feature refuge areas at the 4th, 6th, 11th, and 16th floors for safety.

Land and surroundings

The project is located at Final Plot No. 9, Town Planning Scheme No. 204 (Sarkhej-Okaf-Makarba-Vejalpur-Ambli), in Ambli village, Ahmedabad. The land is classified as non-agricultural for multi-purpose use. The site is bounded by a 60.00-metre wide S.P. Ring Road and 12.00-metre wide roads on other sides.

Water, power and access

During the construction phase, the fresh water requirement is estimated at 27.5 kilolitres per day (KLD), to be supplied by tankers. For the operation phase, the total water requirement is projected at 151.96 KLD. Of this, 98.26 KLD will be fresh water, while 53.70 KLD will be met through treated sewage for flushing and gardening.

Power will be sourced from the local grid. A diesel generator (DG) set of 625 kVA is proposed for emergency backup. The applicant plans to install 61 kW of solar power generation as part of energy conservation measures.

Environmental safeguards

The applicant proposes to install an onsite Sewage Treatment Plant (STP) with a capacity of 150 KLD. Treated wastewater will be reused within the premises. For solid waste, biodegradable waste will be processed in an onsite organic waste converter, while recyclable materials will be sold to vendors.

Rainwater harvesting will be implemented through two percolation wells. The green belt will cover 650.26 square metres (approximately 10% of the plot area), including the plantation of 101 trees. Dust mitigation measures, such as windbreakers up to 10 metres high and water sprinkling, are planned for the construction phase.

Key figures

ItemDetail
Plot Area4,006 sq. m.
Total Built-up Area30,949.77 sq. m.
FSI Area16,782.97 sq. m.
Residential Units176
Commercial Units13
Total Parking Space6,799.52 sq. m. (216 CPS)
STP Capacity150 KLD
Solar Power Generation61 kW
CER Allocation₹1.77 crore

Rashmi Melliore site plan and layout

A drawing from the project's filings. Sign in free to see it.

Rashmi Melliore: Site layout plan: building blocks, fire tender route, and surrounding roads (preview)🔒 Sign in free to see it
Site layout plan: building blocks, fire tender route, and surrounding roads

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is larger than 57% of them.

310 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ambli, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.