Quick answers
What is this project?
This withdrawn mining project by M/S. Yogeshwar Enterprise C/o. Shri Somatbhai Jeshabhai Ravaliya is in Kantvav, Mangrol, Surat, Gujarat. The site covers 2.5 acres.
Who is building it?
The applicant is Ravaliya Somatbhai Jeshabhai.
Has it been approved?
No. The application was withdrawn on 16 Dec 2025, so it is no longer under consideration.
Where is it?
In Kantvav, Mangrol, Surat, Gujarat.
How big is it?
It has a stated cost of ₹4.6 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 16 Dec 2025.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 16 Dec 2025 |
| Application filed | 16 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Ravaliya Somatbhai Jeshabhai |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹4.6 crore |
| Village / locality | Kantvav |
| Taluk / tehsil | Mangrol |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08284 |
In context
155 applications in Surat since January 2022 are in the same category (Mining): 48 approved, 24 filed or under review, and 83 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 91% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 36.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Kantvav, Mangrol, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Yogeshwar Enterprise, Pro. Shri Somatbhai Jeshabhai… — environmental approval granted, 0 m away
- M/S. Shiv Stone Quarry C/o. Kunalbhai Somatbhai Ravaliya (Production Expansion) — lapsed, 150 m away
- Shiv Stone Quarry C/o- Kunalbhai Somatbhai Ravaliya — environmental approval granted, 150 m away
- M/S. Shiv Stone Quarry C/o. Kunalbhai Somatbhai Ravaliya (Production Expansion) — environmental approval granted, 150 m away
- M/s. Shiv Stone Quarry C/o. Kunalbhai Somatbhai Ravaliya (Production Expansion) — environmental approval granted, 200 m away
- Shiv Stone Quarry C/o- Kunalbhai Somatbhai Ravaliya — environmental approval granted, 200 m away
- Mining project by M/s. Karshanbhai Namlabhai Vasava — under environmental review, 200 m away
- Mining project by M/s. Karshanbhai Namalabhai Vasava — under environmental review, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.