Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Dec 2025 |
| Application filed | 29 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dpc Developers Private Limited |
| Use | Residential |
| Towers | 1 |
| Floors (tallest) | 5 |
| Parking spaces | 614 |
| Land area | 9.9 acres (4 ha) |
| Built-up area | 1,04,273 m² (11,22,384 sq ft) |
| Plot area | 40,024 m² (4,30,814 sq ft) |
| Project cost | ₹152 crore |
| Village / locality | Changodar |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08616 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Aug 2026 | Initial checks | 9.9 acres | ₹152 crore |
| New project filed 6 Aug 2026 | Withdrawn | 9.9 acres | ₹152 crore |
| New project filed 29 Aug 2025 (this page) | Environmental approval granted | 9.9 acres | ₹152 crore |
What the filings say
What is planned
The applicant, DPC Developers Private Limited, proposes the construction of a residential project named Siddhivinayak Prime in Changodar. The project is planned on a plot area of 40,934 square metres (10.11 acres) with a total built-up area of 1,04,272.63 square metres.
The development consists of 32 residential blocks. The buildings are designed with a ground floor plus five upper floors. The project will provide a total of 1,160 residential units.
Project Components
| Item | Detail |
|---|---|
| Total Plot Area | 40,934.00 sq. m. |
| Net Plot Area | 40,024.07 sq. m. |
| Total Built-up Area | 1,04,272.63 sq. m. |
| Total Residential Units | 1,160 |
| Number of Blocks | 32 |
| Building Height | Ground + 5 Floors |
| Total Utilised F.S.I. | 71,678.70 sq. m. |
Layout and design
The site layout includes internal roads with widths of 6.00 metres and 7.50 metres to facilitate movement between the 32 blocks. A 12.00-metre wide cross-over road is also integrated into the plan. The ground floor level (hollow plinth) is primarily dedicated to parking.
Common plots for open space and recreation are distributed across the site, designated as CP-1 through CP-7, totaling 4,775.35 square metres (approximately 1.18 acres). The largest common plot, CP-1, measures 1,370.65 square metres.
Land and surroundings
The project is located at Survey numbers 57 Paiki and 18 Paiki in Changodar village, Sanand. The applicant states the site is currently open land and not used for agriculture. The surrounding area is described as a built-up region within the limits of the Ahmedabad Municipal Corporation.
Nearby infrastructure includes the Chandlodiya railway station, located approximately 5.30 km from the site, and the Ahmedabad Airport, which is about 13.71 km away.
Water, power and access
Water for the project will be sourced from the Ahmedabad Municipal Corporation (AMC), specifically Narmada water. The applicant noted that if groundwater extraction becomes necessary, they will seek permission from the Central Ground Water Authority.
For wastewater management, sewage will be treated in an on-site Sewage Treatment Plant (STP). The treated water is intended for flushing and gardening, with any surplus discharged into the AMC drainage line. Rainwater harvesting is planned through 11 percolation wells to recharge ground aquifers.
Power will be supplied by Uttar Gujarat Vij Company Limited (UGVCL). The estimated power requirement is 30 kW during the construction phase and approximately 1.50 MW during the operational phase.
Environmental safeguards
The applicant's environmental management plan includes several measures to mitigate construction impacts:
- Air Quality: Continuous water sprinkling and temporary windshield barriers (bamboo and GI sheets) will be used to control dust and suspended particulate matter.
- Noise Control: Sound enclosures will be provided for high-noise machinery, and workers will be provided with earplugs and earmuffs.
- Solid Waste: Construction waste will be used for leveling low-lying areas on-site. During operation, municipal solid waste will be segregated. Organic waste is planned to be converted to manure using an organic waste converter for use in the project's green belt.
- Green Belt: A total of 1,024 trees are planned for plantation within the premises to meet the requirement of one tree per 40 square metres of plot area.
- Safety: The buildings are designed as earthquake-resistant structures in accordance with relevant Indian Standard codes.
Siddhivinayak Prime site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is larger than 91% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Changodar, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Siddhivinayak prime — initial checks, 0 m away
- Siddhivinayak Prime — withdrawn, 0 m away
- Vrundavan-2 — environmental approval granted, 400 m away
- Project by Acute Research PVT LTD — initial checks, 750 m away
- Proposed Project for Manufacturing of Various Synthetic Organic Chemicals by… — initial checks, 1.1 km away
- Proposed Project for Manufacturing of Various Synthetic Organic Chemicals by… — cleared for impact study, 1.1 km away
- 8'' dia Steel with 125 mm PE Gas Pipeline route Sanand bypass to Kolat -… — forest land use approved, 1.3 km away
- Expansion in Synthetic Organic Chemicals (Resin+ Laminate) Manufacturing Unit… — returned to applicant, 1.6 km away
All 3 Dpc Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.