| Status | Environmental approval granted |
|---|---|
| Status since | 6 Mar 2026 |
| Application filed | 16 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Patel Hirenkumar Bharatbhai |
| Use | Residential |
| Units | 152 |
| Towers | 152 |
| Floors (tallest) | 1 |
| Parking spaces | 334 |
| Land area | 10.5 acres (4.3 ha) |
| Built-up area | 20,089 m² (2,16,236 sq ft) |
| Plot area | 42,518 m² (4,57,660 sq ft) |
| Project cost | ₹99 lakh |
| Village / locality | Mahesana (M) |
| Taluk / tehsil | Mahesana |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08689 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 May 2026 | Returned to applicant | 10.5 acres | ₹99 lakh |
| New project filed 16 Oct 2025 (this page) | Environmental approval granted | 10.5 acres | ₹99 lakh |
What the filings say
What is planned
Shashwat Prime City is a residential building construction project proposed by the applicant, Patel Hirenkumar Bharatbhai. According to the environmental approval documents, the project is planned on a plot area of 4.25 hectares (10.50 acres) and will consist of 152 residential bungalows.
The project involves the construction of buildings with a ground floor and one upper floor. The total built-up area is specified as 20,089.32 square metres, with a total Floor Space Index (FSI) area of 18,577 square metres. The bungalows are divided into several unit types, including Units C, D, E, E1, F, F1, G, H, I, J, K, L, O, P, Q, and R.
Layout and design
The master plan shows a gated community layout with internal roads of varying widths, including 6.0-metre, 9.0-metre, and 12.0-metre wide internal roads. The project site is bordered by an 18.0-metre wide Development Plan (DP) main road.
The design includes several common plots distributed throughout the site. The bungalows are arranged in rows, with individual plot areas ranging from approximately 102 square metres to over 300 square metres for larger corner plots. The applicant has proposed a total parking area of 7,682 square metres, providing space for 334 cars in open areas. The approval conditions require that 20% of the car parking spaces include electric charging points.
Water, power and access
The total water requirement during the operation phase is estimated at 207.60 kilolitres per day (KLD). Of this, 114.72 KLD will be fresh water supplied by the Mehsana Municipal Corporation (MMC), while the remaining 92.88 KLD will be met through treated sewage for flushing and gardening.
Sewage generation is expected to be 138.21 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 150 KLD using Moving Bed Biofilm Reactor (MBBR) technology. For storm water management, the applicant plans to develop 11 percolation wells for groundwater recharge.
Power backup will be provided by a 100 KVA diesel generator set. Energy conservation measures include the installation of solar street lights and a 456 KW solar power generation system.
Environmental safeguards
The Environment Management Plan (EMP) includes a proposed green belt area of 1.10 hectares (2.72 acres), which is approximately 26% of the total plot area. This area will include 1,064 trees.
During construction, dust suppression will be managed through regular water sprinkling. Solid waste will be segregated at the source; biodegradable waste will be treated in an on-site organic waste converter, while recyclable materials will be sold to vendors. The MMC will collect the remaining garbage from 20 community bins, each with an 80-litre capacity, located within the premises.
Corporate Environmental Responsibility
The applicant has committed ₹1.98 crore toward Corporate Environmental Responsibility (CER) activities. These include:
- Planting approximately 2,000 trees on the divider of the main road with five years of maintenance.
- Installing solar panels at village schools and Gram Panchayats in Talavadiya, Ramosana, and Dela.
- Providing solar panel trees in garden areas of the same villages.
- Constructing three percolation wells in each of the three villages.
- Deepening and beautifying the village lake at Talavadiya.
Shashwat Prime City site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
33 applications in Mahesana since January 2022 are in the same category (Buildings & townships): 25 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 10.5 acres, this one is larger than 63% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahesana (M), Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shashwat Prime City — returned to applicant, 0 m away
- Heritage Sky View — under environmental review, 250 m away
- Strengthening of Mehsana - Visnagar Road Km 0/00 to 6/600 (Resurfacing… — more information requested, 750 m away
- Manidhar Sky — environmental approval granted, 1.2 km away
- Shubh Heights H M Infra — environmental approval granted, 1.5 km away
- 'Redevelopment and Reconstruction of Existing General Hospital Mehsana' — environmental approval granted, 2.3 km away
- Shivalik Velenza — environmental approval granted, 4.5 km away
- Proposed Expansion of Residential Project "Sahaj Glimmer" — under environmental review, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.