One of 2 filings for this project. The project's main page, with every filing and where each stands: Shashwat Prime City
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 13 Oct 2026 |
| Application filed | 5 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Patel Hirenkumar Bharatbhai |
| Land area | 10.5 acres (4.3 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Mahesana (M) |
| Taluk / tehsil | Mahesana |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10633 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 May 2026 (this page) | Returned to applicant | 10.5 acres | ₹99 lakh |
| New project filed 16 Oct 2025 | Environmental approval granted | 10.5 acres | ₹99 lakh |
What the filings say
What is planned
Shashwat Prime City is a residential bungalow project proposed by H.P. Developers on a plot area of 4.25 hectares (10.50 acres). The applicant's project report states that the development will consist of 152 residential bungalows.
The project is divided into several building types or wings, designated as Units C through R, along with Units E1 and F1. Each bungalow is designed with a ground floor and one upper floor. The total built-up area is 20,089.32 square metres, with a proposed Floor Space Index (FSI) area of 18,577.00 square metres.
| Item | Detail |
|---|---|
| Total Plot Area | 4.25 hectares (10.50 acres) |
| Total Built-up Area | 20,089.32 sq. m. |
| Total FSI Area | 18,577.00 sq. m. |
| Total Residential Units | 152 bungalows |
| Building Height | Ground + 1 Floor |
| Total Parking Provided | 334 Cars (7,682 sq. m.) |
| Estimated Project Cost | ₹0.99 crore |
Layout and design
The master plan shows a gated community layout with internal roads of varying widths, including 12.0-metre, 9.0-metre, and 6.0-metre wide internal roads. The site features multiple common plots for open space and recreation.
Each bungalow unit includes a dedicated staircase with a width of 1.83 metres. The design incorporates energy conservation measures such as natural lighting, LED fixtures, and 456 KW of solar power generation. The applicant also proposes to use aerated blocks and Ready Mix Concrete (RMC) for construction. For accessibility, the buildings will include disabled-friendly designs.
Land and surroundings
The project is located at New Survey No. 436, near Ratanvihar Party Plot on Visnagar Road in Mehsana. The land is designated for residential use. According to the environmental clearance, the site overlaps with an Oil and Natural Gas Corporation (ONGC) area, but ONGC has issued a No Objection Certificate stating they have no existing plants or development wells at the site.
Water, power and access
The total water requirement during the operation phase is estimated at 207.60 kilolitres per day (KLD). Of this, 114.72 KLD will be fresh water supplied by the Mehsana Municipal Corporation (MMC), while 92.88 KLD will be met through treated sewage. During construction, water will be sourced via tankers.
Domestic wastewater, estimated at 138.21 KLD, will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 150 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing and gardening via a dual plumbing system. Stormwater management includes 11 percolation wells for groundwater recharge.
Power will be sourced from the state grid, with a 100 KVA diesel generator set proposed for backup. Access to the site is provided from an 18.0-metre wide Development Plan (DP) main road.
Environmental safeguards
The applicant has allocated ₹1.98 crore for Corporate Environmental Responsibility (CER) activities. These include planting approximately 2,000 trees on the main road divider and installing solar panels at village schools and Gram Panchayats in Talavadiya, Ramosana, and Dela.
A green belt of 1.10 hectares (2.72 acres), representing approximately 25% of the plot area, is planned. This includes a tree-covered area of 5,320 square metres with 1,064 trees. For waste management, the project will use an on-site Organic Waste Converter to treat biodegradable waste, while other garbage will be collected in community bins for disposal by the municipal authority.
Shashwat Prime City site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
33 applications in Mahesana since January 2022 are in the same category (Buildings & townships): 25 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 10.5 acres, this one is larger than 63% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahesana (M), Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shashwat Prime City — environmental approval granted, 0 m away
- Heritage Sky View — under environmental review, 250 m away
- Strengthening of Mehsana - Visnagar Road Km 0/00 to 6/600 (Resurfacing… — more information requested, 750 m away
- Manidhar Sky — environmental approval granted, 1.2 km away
- Shubh Heights H M Infra — environmental approval granted, 1.5 km away
- 'Redevelopment and Reconstruction of Existing General Hospital Mehsana' — environmental approval granted, 2.3 km away
- Shivalik Velenza — environmental approval granted, 4.5 km away
- Proposed Expansion of Residential Project "Sahaj Glimmer" — under environmental review, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.