Quick answers
What is Industrial project by Jyoti Resins & Adhesives Ltd.?
This proposed industrial project by Jyoti Resins & Adhesives Ltd. is in Santej, Kalol Gandhinagar, Gandhinagar, Gujarat. The site covers 1.7 acres.
Who is building it?
The applicant is Jyoti Resins and Adhesives Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Santej, Kalol Gandhinagar, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹6.2 crore and a site of 1.7 acres.
When was it filed?
The application was filed on 13 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial project by Jyoti Resins & Adhesives Limited
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 4 Sept 2025 |
| Application filed | 13 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Jyoti Resins and Adhesives Limited |
| Land area | 1.7 acres (0.7 ha) |
| Project cost | ₹6.2 crore |
| Village / locality | Santej |
| Taluk / tehsil | Kalol Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08742 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 28 Jan 2026 | Environmental approval granted | 1.7 acres | ₹6.2 crore |
| Expansion filed 13 Aug 2025 (this page) | Returned to applicant | 1.7 acres | ₹6.2 crore |
In context
97 applications in Gandhinagar since January 2022 are in the same category (Industry): 70 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.7 acres, this one is larger than 64% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Santej, Kalol Gandhinagar, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Jyoti Resins & Adhesives Limited — environmental approval granted, 0 m away
- Environment Clearance for the Township project -"Super Residency" at B.No.… — environmental approval granted, 800 m away
- Industrial project by M/S. Prem Conductors Pvt. Ltd. — more information requested, 2.1 km away
- Industrial project by Kansara Popatlal, Tribhovandas Metal Pvt. Ltd. — under environmental review, 2.7 km away
- Project by Lincoln Pharmaceuticals Limited — initial checks, 4.9 km away
- Arvind Forreste — environmental approval granted, 5.3 km away
- Proposed Expansion in Existing Plant Capacity of Synthetic Organic Chemicals… — cleared for impact study, 6 km away
- Amendment in the existing EC by M/s. Balaji Formalin Pvt. Ltd. located at… — lapsed, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.