Quick answers
What is this project?
EC and CRZ Clearance of Proposed Project of RSPL Chemical Complex for Production of Dense Soda Ash (1500 TPD), Refined Bi-Carbonate (400 TPD), Captive Cogeneration Power Plant (50 MW to 67 MW) and CFBC Boilers (450 TPH to 600 TPH) at existing Soda Ash Plant manufacturing facilities of RSPL Limited, Village: Kuranga, Taluka: Dwarka, District: Devbhumi Dwarka, Gujarat is an approved industrial project in Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat. The site covers 1,334.5 acres.
Who is building it?
The applicant is M/s RSPL Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Aug 2025), as of 27 Nov 2026.
Where is it?
In Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹5,779 crore and a site of 1,334.5 acres.
When was it filed?
The application was filed on 17 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Aug 2025 |
| Application filed | 17 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | M/s RSPL Limited |
| Land area | 1,334.5 acres (540.1 ha) |
| Project cost | ₹5,779 crore |
| Village / locality | Kuranga |
| Taluk / tehsil | Okhamandal |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09018 |
In context
8 applications in Devbhumi Dwarka since January 2022 are in the same category (Industry): 4 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EC and CRZ Clearance of Proposed Project of RSPL Chemical Complex for… — lapsed, 0 m away
- EC and CRZ Clearance of Proposed Project of RSPL Chemical Complex for… — cleared for impact study, 0 m away
- Diversion of 2.01 Ha of Forest Land for Transportation of Men & Materials and… — initial checks, 1.2 km away
- Gandhvi to Gorinja UG Drinking water pipeline — lapsed, 1.6 km away
- Approach road for store (Kuranga Village) — forest land use approved, 1.9 km away
- Captive Jetty with Throughput of 3.2 MMTPA for RSPL Soda Ash Plant — cleared for impact study, 1.9 km away
- Permission for Laying Ug Drinking Water Pipeline in Various Forest Land and Pf… — forest land use approved, 2 km away
- Approach road for store (Village: Bhatvadiya)(Second Store) — more information requested, 2.6 km away
More from M/s RSPL Limited in Devbhumi Dwarka
- EC and CRZ Clearance of Proposed Project of RSPL Chemical Complex for… — lapsed
- EC and CRZ Clearance of Proposed Project of RSPL Chemical Complex for… — cleared for impact study
All 5 RSPL projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.