EC and CRZ Clearance of Proposed Project of RSPL Chemical Complex for Production of Dense Soda Ash (1500 TPD), Refined Bi-Carbonate (400 TPD), Captive Cogeneration Power Plant (50 MW to 67 MW) and CFBC Boilers (450 TPH to 600 TPH) at existing Soda Ash Plant manufacturing facilities of RSPL Limited, Village: Kuranga, Taluka: Dwarka, District: Devbhumi Dwarka, Gujarat

EC and CRZ Clearance of Proposed Project of RSPL Chemical Complex for Production of Dense Soda Ash (1500 TPD), Refined Bi-Carbonate (400 TPD), Captive Cogeneration Power Plant (50 MW to 67 MW) and CFBC Boilers (450 TPH to 600 TPH) at existing Soda Ash Plant manufacturing facilities of RSPL Limited, Village: Kuranga, Taluka: Dwarka, District: Devbhumi Dwarka, Gujarat is a lapsed building project in Goji Nes, Kalyanpur, Devbhumi Dwarka, Gujarat. The site covers 1,334.5 acres. Its stated project cost is ₹5,779 crore. As of 27 Nov 2026, its status is “Lapsed” (since 17 Feb 2026).

See it on the live map All projects in Devbhumi Dwarka

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

EC and CRZ Clearance of Proposed Project of RSPL Chemical Complex for Production of Dense Soda Ash (1500 TPD), Refined Bi-Carbonate (400 TPD), Captive Cogeneration Power Plant (50 MW to 67 MW) and CFBC Boilers (450 TPH to 600 TPH) at existing Soda Ash Plant manufacturing facilities of RSPL Limited, Village: Kuranga, Taluka: Dwarka, District: Devbhumi Dwarka, Gujarat is a lapsed building project in Goji Nes, Kalyanpur, Devbhumi Dwarka, Gujarat. The site covers 1,334.5 acres.

Who is building it?

The applicant is M/s RSPL Limited.

Has it been approved?

No. The application was lapsed on 17 Feb 2026, so it is no longer under consideration.

Where is it?

In Goji Nes, Kalyanpur, Devbhumi Dwarka, Gujarat.

How big is it?

It has a stated cost of ₹5,779 crore and a site of 1,334.5 acres.

When was it filed?

The application was filed on 3 May 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: EC and CRZ Clearance of Proposed Project of RSPL Chemical Complex for Production of…

Project details

StatusLapsed
Status since17 Feb 2026
Application filed3 May 2025
Approval soughtCoastal review
Application typeNew project
SectorBuildings & townships
ApplicantM/s RSPL Limited
Land area1,334.5 acres (540.1 ha)
Project cost₹5,779 crore
Village / localityGoji Nes
Taluk / tehsilKalyanpur
DistrictDevbhumi Dwarka
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14784

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 3 May 2025 (this page)Lapsed1,334.5 acres₹5,779 crore
Early planning filed 10 May 2023Cleared for impact study1,334.5 acres₹5,779 crore

In context

16 applications in Devbhumi Dwarka since January 2022 are in the same category (Buildings & townships): 4 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. At 1,334.5 acres, this one is larger than 92% of them.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Goji Nes, Kalyanpur, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M/s RSPL Limited in Devbhumi Dwarka

All 5 RSPL projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.