Quick answers
What is Maruti Dye Chem?
Maruti Dye Chem is a proposed industrial project in Mota Borsara, Mangrol, Surat, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Pratik B Raiyani.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 Jul 2026), as of 27 Nov 2026.
Where is it?
In Mota Borsara, Mangrol, Surat, Gujarat.
How big is it?
It has a stated cost of ₹95 lakh and a site of 0.2 acres.
When was it filed?
The application was filed on 13 Nov 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Jul 2026 |
| Application filed | 13 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Pratik B Raiyani |
| Land area | 700 m² |
| Project cost | ₹95 lakh |
| Village / locality | Mota Borsara |
| Taluk / tehsil | Mangrol |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09219 |
In context
103 applications in Surat since January 2022 are in the same category (Industry): 59 approved, 29 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mota Borsara, Mangrol, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion Of 0.2003 Ha. Protected Forest Land For The Grant Permission For… — lapsed, 1.7 km away
- Traffic safety improvement at the existing Vadoli Main Road × Kim Road junction — more information requested, 1.8 km away
- Proposed Amendment in Existing Ec for Bulk Drug & Bulk Drug Intermediates… — environmental approval granted, 5.4 km away
- Power project by M/s. PGP Glass Limited — under environmental review, 5.9 km away
- Power project by M/s. PGP Glass Pvt. Ltd. — environmental approval granted, 5.9 km away
- Laying of New Ofc Based Connectivity for Kosamba Rr Station Via Gprp — forest land use approved, 6 km away
- 125/90 mm dia. PE Pipeline To connect M/s Shyam Creation on Kosamba-Sahol Road… — forest land use approved, 6 km away
- Diversion of 0.6598 ha. Protected Forest land for the grant permission for… — lapsed, 6.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.