Quick answers
What is this project?
Traffic safety improvement at the existing Vadoli Main Road × Kim Road junction is a proposed road project in Kim, Olpad, Surat, Gujarat. The site covers 9.5 acres.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kim, Olpad, Surat, Gujarat.
How big is it?
It has a stated cost of ₹5 lakh; a site of 9.5 acres and 150 m² of forest land.
When was it filed?
The application was filed on 4 Jun 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 10 Jul 2026 |
| Application filed | 4 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer |
| Land area | 9.5 acres (3.9 ha) |
| Forest land | 150 m² |
| Project cost | ₹5 lakh |
| Village / locality | Kim |
| Taluk / tehsil | Olpad |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13769 |
In context
59 applications in Surat since January 2022 are in the same category (Roads & highways): 13 approved, 30 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 9.5 acres, this one is larger than 73% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kim, Olpad, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion Of 0.2003 Ha. Protected Forest Land For The Grant Permission For… — lapsed, 1.3 km away
- Maruti Dye Chem — cleared for impact study, 1.8 km away
- 125/90 mm dia. PE Pipeline To connect M/s Shyam Creation on Kosamba-Sahol Road… — forest land use approved, 6 km away
- Power project by M/s. PGP Glass Limited — under environmental review, 6.3 km away
- Power project by M/s. PGP Glass Pvt. Ltd. — environmental approval granted, 6.3 km away
- Aug. Variyav Reginal Water Supply Scheme Ph-2 — lapsed, 6.4 km away
- Laying of New Ofc Based Connectivity for Kosamba Rr Station Via Gprp — forest land use approved, 6.4 km away
- Grant Permission for Diversion of 0.175 Ha of Social Forest Land for Laying of… — lapsed, 6.9 km away
More from Executive Engineer in Surat
- Diversion of 34.6289 Ha. of Forest Land for Widening and Strengthening of… — under forest review
- Diversion of 31.5581 Hectare of Forest Land for Widening and Strengthening of… — under forest review
- Diversion of 0.90 Ha of Protected Forest Land for Widening and Strengthening… — more information requested
- Diversion of Protected Forest Land for widening of Umarpada - Ghata Road (ODR)… — more information requested
- Diversion of Protected Forest Land for Widening to connect proposed bridge on… — lapsed
- Diversion of Protected Forest Land for widening of Mandvi - Sherulla Road… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.