Ishvara is an approved mixed-use project in Abrama, Valsad, Gujarat. It plans 149 units in 5 towers of up to 14 floors on 2.3 acres.
Who is building it?
The applicant is Shree Ram Residential LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Jun 2026), as of 27 Nov 2026.
Where is it?
In Abrama, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹83 crore and a site of 2.3 acres.
When was it filed?
The application was filed on 2 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Jun 2026 |
| Application filed | 2 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shree Ram Residential LLP |
| Use | Mixed use |
| Units | 149 |
| Towers | 5 |
| Floors (tallest) | 14 |
| Basements | 1 |
| Parking spaces | 273 |
| Land area | 2.3 acres (0.9 ha) |
| Built-up area | 35,788 m² (3,85,218 sq ft) |
| Plot area | 9,374 m² (1,00,901 sq ft) |
| Project cost | ₹83 crore |
| Village / locality | Abrama |
| Taluk / tehsil | Valsad |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09367 |
In context
64 applications in Valsad since January 2022 are in the same category (Buildings & townships): 46 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.3 acres, this one is smaller than 74% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abrama, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 90 mm PE Gas Pipeline Connectivity To Connect Domestic And Commercial… — forest land use approved, 1.5 km away
- Proposed Expansion Project for Manufacturing of Bulk Drugs (EXCIPIENTS) by M/s… — environmental approval granted, 3.2 km away
- Forest land proposal for Diversion for Social Forest Land proposal for forest… — forest land use approved, 3.4 km away
- Forest land proposal for Diversion for Social Forest Land proposal for forest… — lapsed, 3.4 km away
- 125 mm PE Gas pipeline connectivity from CNG Station Parnera to Potential… — forest land use approved, 3.7 km away
- 90/63/32 mm PE Gas Pipeline for Vejalpur Connectivity, Ta: Valsad, Dist.-Valsad. — forest land use approved, 4.2 km away
- Gas Distribution Network in Valsad Taluka & Surrounding Area (Dadri Faliya,… — forest land use approved, 4.4 km away
- Industrial project by M/s. Stalwart Advance Material Industries — under environmental review, 5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.