Quick answers
What is this project?
Proposed Expansion Project for Manufacturing of Bulk Drugs (EXCIPIENTS) by M/s Deepak Cellulose Pvt. Ltd is an approved industrial project in Gundlav, Valsad, Gujarat. The site covers 0.9 acres.
Who is building it?
The applicant is Deepak Cellulose Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Nov 2022), as of 27 Nov 2026.
Where is it?
In Gundlav, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹6 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 30 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Nov 2022 |
| Application filed | 30 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Deepak Cellulose Private Limited |
| Land area | 3,500 m² |
| Project cost | ₹6 crore |
| Village / locality | Gundlav |
| Taluk / tehsil | Valsad |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00221 |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.9 acres, this one is smaller than 70% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gundlav, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Stalwart Advance Material Industries — under environmental review, 1.9 km away
- Industrial project by M/s. Stalwart Advance Material Industries — under environmental review, 1.9 km away
- 90/63/32 mm PE Gas Pipeline for Vejalpur Connectivity, Ta: Valsad, Dist.-Valsad. — forest land use approved, 2.2 km away
- Gas Distribution Network in Valsad Taluka & Surrounding Areas, Diversion of… — lapsed, 2.4 km away
- Widening and strengthening of Valsad-Gundlav-Khergam road km 2/0 to 16/0 Ta.… — more information requested, 3 km away
- Ishvara — environmental approval granted, 3.2 km away
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested, 3.7 km away
- 90 mm PE Gas Pipeline Connectivity To Connect Domestic And Commercial… — forest land use approved, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.