What is Developing? Open the mapMap

Initial checksBuildings & townships · Surat, Gujarat

Residential cum Commercial Project – "Pavitra Pali Vihar" by Mr. Harishchandra Ramanlal Naik at Block No.: 292, O. P. No.: 97/A, F. P. No.: 97/A/1, T.P.S. No.: 62 (Dindoli-Bhestan-Bhedwad), Moje: Dindoli, Tal.: Udhana, Dist.: Surat, Gujarat – 394210

Residential cum Commercial Project – "Pavitra Pali Vihar" by Mr. Harishchandra Ramanlal Naik at Block No.: 292, O. P. No.: 97/A, F. P. No.: 97/A/1, T.P.S. No.: 62 (Dindoli-Bhestan-Bhedwad), Moje: Dindoli, Tal.: Udhana, Dist.: Surat, Gujarat – 394210 is a proposed building project in Dindoli, Majura, Surat, Gujarat. The site covers 2 acres. Its stated project cost is ₹93.9 crore. As of 27 Nov 2026, its status is “Initial checks” (since 19 Oct 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Residential cum Commercial Project – "Pavitra Pali Vihar" by Mr. Harishchandra Ramanlal Naik at Block No.: 292, O. P. No.: 97/A, F. P. No.: 97/A/1, T.P.S. No.: 62 (Dindoli-Bhestan-Bhedwad), Moje: Dindoli, Tal.: Udhana, Dist.: Surat, Gujarat – 394210 is a proposed building project in Dindoli, Majura, Surat, Gujarat. The site covers 2 acres.

Who is building it?

The applicant is Harishchandra Ramanlal Naik.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Dindoli, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹93.9 crore and a site of 2 acres.

When was it filed?

The application was filed on 29 Aug 2026.

Project details

Official titleProposed Construction of Residential cum Commercial Project – "Pavitra Pali Vihar" by Mr. Harishchandra Ramanlal Naik at Block No.: 292, O. P. No.: 97/A, F. P. No.: 97/A/1, T.P.S. No.: 62 (Dindoli-Bhestan-Bhedwad), Moje: Dindoli, Tal.: Udhana, Dist.: Surat, Gujarat – 394210
StatusInitial checks
Status since19 Oct 2026
Application filed29 Aug 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantHarishchandra Ramanlal Naik
Land area2 acres (0.8 ha)
Project cost₹93.9 crore
Village / localityDindoli
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-09609

What the filings say

What is planned

Mr. Harishchandra Ramanlal Naik proposes the construction of a residential cum commercial project named "Pavitra Pali Vihar" in Surat. The applicant's conceptual plan describes a mixed-use development consisting of seven building blocks (A to G) with a maximum height of 40.70 metres.

The project is designed to provide 332 residential flats and 93 commercial shops. The residential units are divided into 88 three-BHK (three-bedroom, hall, and kitchen) flats and 244 two-BHK flats. The commercial component includes shops on the ground floor and office spaces on the first floor.

Building Configuration

Building TypeFloorsComponentsHeight
Building ABasement + G + 1227 Shops, 44 Flats (2 BHK)40.50 m
Building B & CBasement + G + 1246 Shops, 88 Flats (3 BHK)40.50 m
Building DBasement + G + 1220 Shops, 44 Flats (2 BHK)40.50 m
Building E & FBasement + G + 1296 Flats (2 BHK)40.50 m
Building GBasement + G + 1260 Flats (2 BHK)40.70 m

The total built-up area is planned at 40,474.55 square metres, with a Floor Space Index (FSI) area of 25,367.53 square metres. The project occupancy is estimated at 2,027 persons, including 1,748 residents, 186 users, and 93 visitors.

Layout and design

The project includes a basement for parking and services. A total parking area of 8,390.01 square metres is proposed, providing space for 474 Equivalent Car Spaces (ECS). This is distributed across the basement (193 ECS), hollow plinth (36 ECS), open parking (52 ECS), and mechanical parking in the basement (193 ECS).

Internal facilities include earthquake-proof Reinforced Cement Concrete (RCC) design, granamite tile flooring, and internal plumbing and sanitation. Physical infrastructure includes paver block pavements, street lights, and broadband connectivity.

Land and surroundings

The project will be constructed on 0.81 hectares (2.00 acres) of private land. The site is located within Surat city limits. According to the site analysis, the nearest railway station is Udhana Junction, approximately 2.63 km away in the northwest direction. Surat International Airport is located about 13.48 km from the site. The Tapi River is approximately 7.60 km to the north. There are no national parks or wildlife sanctuaries within a 10 km radius.

Water, power and access

During the operational phase, the total water requirement is estimated at 253.89 kilolitres per day (KLD). Fresh water of 162.44 KLD will be sourced from the Surat Municipal Corporation (SMC). The project plans to reuse 91.45 KLD of treated wastewater for flushing and gardening during non-monsoon periods.

Power will be supplied by Dakshin Gujarat Vij Company Ltd. (DGVCL), with a total operational requirement of 2,062 KVA (1,650 KWH). Two diesel generator sets of 250 KVA each are proposed for backup. The applicant also plans to install 320 solar panels on the rooftops, expected to generate 160 KW.

Environmental safeguards

A Sewage Treatment Plant (STP) with a capacity of 250 KLD using Moving Bed Biofilm Reactor (MBBR) technology is proposed. For solid waste, the project will generate approximately 856.35 kg per day during operation. Organic waste will be treated using two organic waste converters with a capacity of 300 kg per day each to produce manure for the green belt.

The green belt development will cover 1,628.58 square metres (0.40 acres), including 812 square metres of tree cover and 816.58 square metres of lawn area. A total of 203 trees are proposed to be planted. For rainwater harvesting, three percolation wells with recharging pits are planned.

Timeline

The project implementation schedule estimates a total construction period of approximately 48 months. This includes 4 months for foundation work, 5 months for basement works, 20 months for the main building floors (1st to 12th), and subsequent periods for plastering, plumbing, and electrification.

Mr. Harishchandra Ramanlal Residential Cum Commercial Project – "Pavitra Pali Vihar" site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Mr. Harishchandra Ramanlal Residential Cum Commercial Project – "Pavitra Pali Vihar": Master layout plan: building blocks, internal roads, and common plots (preview)🔒 Sign in free to see it
Master layout plan: building blocks, internal roads, and common plots
Mr. Harishchandra Ramanlal Residential Cum Commercial Project – "Pavitra Pali Vihar": Site layout: building footprints and parking areas (preview)🔒 Sign in free to see it
Site layout: building footprints and parking areas
Mr. Harishchandra Ramanlal Residential Cum Commercial Project – "Pavitra Pali Vihar": Ground floor and 2nd floor plan for building blocks A to G (preview)🔒 Sign in free to see it
Ground floor and 2nd floor plan for building blocks A to G
Mr. Harishchandra Ramanlal Residential Cum Commercial Project – "Pavitra Pali Vihar": Section elevations for building blocks A, B, C, and D (preview)🔒 Sign in free to see it
Section elevations for building blocks A, B, C, and D

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is larger than 67% of them.

62 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dindoli, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.