Project details
| Status | Under environmental review |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 3 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Motera Enterprise LLP |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹170.1 crore |
| Village / locality | Chandkeda |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09645 |
What the filings say
What is planned
Motera Enterprise LLP proposes the construction of a residential project named Shyam Heritage in Chandkheda, Ahmedabad. According to the applicant's project report and master plan, the development is planned on a plot area of 12,292 square metres (1.23 hectares).
The project consists of 52 residential units, primarily designed as bungalows. The layout is divided into several clusters:
- Bungalows 1 to 12A: 13 units
- Bungalows 14 to 18 and 32 to 37: 12 units
- Bungalows 20 to 31: 12 units
- Bungalows 38 to 52: 15 units
The buildings are designed with a ground floor and two upper floors (G+2). The total utilized Floor Space Index (FSI) area is stated as 14,057.16 square metres, while the total built-up area is 25,053.91 square metres.
Layout and design
The master plan indicates a central common plot area of 1,236.20 square metres (approximately 10% of the plot area). This space includes society amenities such as a society office and common member areas. The internal circulation is managed via 7.50-metre wide approach roads, with the main entry provided from a 12.00-metre wide Town Planning Scheme (TPS) road.
Parking facilities are provided at the ground level of individual units and within a basement area. The project includes a dedicated ramp with a 1:7 slope and a width of 6.00 metres for basement access.
Water, power and access
Domestic wastewater will be disposed of through the Ahmedabad Municipal Corporation (AMC) drainage system. For storm water management, the applicant proposes to develop three rainwater harvesting recharge wells. The rain water harvesting system includes a collection trench, filtration tank, and percolation wells designed to reach the underground aquifer.
Solid waste management involves the separation of waste at the source. The applicant plans to provide seven community bins, each with an 80-litre capacity, at various locations within the premises for collection by the municipal authority.
Environmental safeguards
The Environmental Management Plan (EMP) outlines several mitigation measures:
- Air Quality: Regular water sprinkling during construction to control fugitive dust. Engines of construction machinery will be turned off when not in use.
- Noise Control: Construction personnel exposed to high noise levels will be provided with ear mufflers.
- Landscape: The plan includes the plantation of evergreen and ornamental flowering trees, palms, and shrubs in open spaces. The applicant calculates a requirement for 307 trees and proposes to provide 308.
- Energy and Design: The buildings will feature energy-efficient lighting and ventilation, timber-free construction, and a disabled-friendly design. Solar-assisted water heating and rooftop solar energy installations are also planned as per local regulations.
- Fire Safety: The project includes a fire protection system with a 1,00,000-litre underground tank and a 20,000-litre overhead tank. Fire lifts, hydrants, and smoke indicators will be installed according to safety norms.
| Item | Detail |
|---|---|
| Plot Area | 12,292 sq. mt. (1.23 hectares) |
| Total Built-up Area | 25,053.91 sq. mt. |
| Total FSI Area | 14,057.16 sq. mt. |
| Total Residential Units | 52 |
| Common Plot Area | 1,236.20 sq. mt. |
| Proposed Trees | 308 |
| Rainwater Recharge Wells | 3 |
Shyam Heritage site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is larger than 79% of them.
71 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandkeda, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shashwat Elysium — environmental approval granted, 100 m away
- NOVUS- Business Park — environmental approval granted, 300 m away
- NOVUS- Business Park — environmental approval granted, 300 m away
- North Palace — lapsed, 500 m away
- North Palace — environmental approval granted, 500 m away
- Proposed Expansion in EC for Commercial Project - "EMPORIS" by Aarush Spaces… — environmental approval granted, 650 m away
- Kautilya Crystal — initial checks, 750 m away
- Proposed Building Construction Project by Bhavil P Jain — under environmental review, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.