Project details
| Status | Initial checks |
|---|---|
| Status since | 1 Oct 2026 |
| Application filed | 17 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Aariv Developers LLP |
| Land area | 4,000 m² |
| Project cost | ₹97 lakh |
| Village / locality | Chandkeda |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10661 |
What the filings say
What is planned
Aariv Developers LLP proposes the construction of Kautilya Crystal, a residential and commercial mixed-use project in Chandkeda, Ahmadabad. According to the conceptual plan, the development will consist of two main blocks, Block A and Block B, rising to 13 floors above ground level, supported by two basement levels for parking.
The project is planned to include a total of 144 residential units and 18 commercial units. The residential component is distributed across both blocks, with Block A containing 96 units and Block B containing 48 units. The commercial units, designated as shops, are located on the ground and first floors of the buildings.
Building Configuration
| Item | Detail |
|---|---|
| Tallest Building | 13 Floors |
| Total Residential Units | 144 |
| Total Commercial Units | 18 |
| Basement Levels | 2 (Parking) |
| Total Built-up Area | 24,856.91 square metres |
| Total Utilized FSI Area | 14,021.79 square metres |
Layout and design
The site layout features a central common plot of 398.30 square metres (0.04 hectares), representing 10% of the plot area. Block A is positioned towards the rear of the site, while Block B is situated closer to the 30.00-metre wide Town Planning Scheme (TPS) road that provides primary access.
Parking is organized across the two basements and the hollow plinth (ground level). The applicant has planned for mechanical parking systems to optimize space. The design includes specific provisions for fire safety, including fire lifts in both blocks (22-person capacity in Block A and 14-person capacity in Block B) and refuge areas on the 5th, 7th, and 11th floors. Society common amenities are planned on the ground and first floors, totaling 119.04 square metres.
Land and surroundings
The project is located on Final Plot No. 296 of Town Planning Scheme No. 22 (Chandkheda) in the Sabarmati taluk. The total plot area is 3,982 square metres (0.4 hectares). The site is bounded by adjacent final plots (FP 245, 247, and 248) and the 30.00-metre TPS road. The applicant's plan indicates a requirement for 100 trees to be planted on the premises, which they have committed to provide.
Water, power and access
Primary access to the site is via the 30.00-metre wide TPS road. Internal circulation is managed through 6.00-metre and 7.00-metre wide approach roads and ramps. For water management, the applicant proposes an underground water tank with a capacity of 1,00,000 litres and a terrace tank of 20,000 litres for fire protection. A separate domestic water storage system is also planned. Power infrastructure will be provided as per standard regulations, including a dedicated transformer area and meter rooms for both blocks.
Environmental safeguards
The project includes several environmental management components:
- Rainwater Harvesting: One percolation well is planned to manage storm water runoff.
- Solid Waste Management: The applicant has calculated a requirement for 12 dustbins of 80-litre capacity for residential waste and 4 bins of 80-litre capacity for commercial waste. A dedicated space for solid waste segregation and collection is marked on the site plan.
- Sewage Treatment: A Sewage Treatment Plant (STP) is indicated in the basement layout to treat domestic wastewater.
- Renewable Energy: The plan specifies the installation of a rooftop solar energy system as per the Comprehensive General Development Control Regulations (CGDCR).
Kautilya Crystal site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 84% of them.
100 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandkeda, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Building Construction Project by Bhavil P Jain — under environmental review, 550 m away
- Maitri Revolution — environmental approval granted, 650 m away
- Shashwat Elysium — environmental approval granted, 650 m away
- Shyam Heritage — under environmental review, 750 m away
- Proposed Residential and Commercial (Essential Shops) Project 'Sampad Arista' — environmental approval granted, 1000 m away
- NOVUS- Business Park — environmental approval granted, 1 km away
- NOVUS- Business Park — environmental approval granted, 1 km away
- The Marigold — environmental approval granted, 1.1 km away
About this information