Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Serenity Status

Serenity Status is an approved residential project in Khodiyar, Daskroi, Ahmadabad, Gujarat. The site covers 1 acre. Its stated project cost is ₹35.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Jul 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since10 Jul 2026
Application filed9 Apr 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorBuildings & townships
ApplicantStatus Infra
UseResidential
Land area1 acres (0.4 ha)
Project cost₹35.6 crore
Village / localityKhodiyar
Taluk / tehsilDaskroi
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-09651

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 14 Aug 2026Initial checks1 acre₹69 crore
Ownership transfer filed 9 Apr 2026 (this page)Environmental approval granted1 acre₹35.6 crore

What the filings say

What is planned

Serenity Status is a residential expansion project by Status Infra. The applicant proposes to construct three residential buildings, designated as Blocks A, B, and C, on a plot area of 0.42 hectares (1.04 acres). The project is designed to accommodate 136 residential units.

Each of the three blocks will consist of two basements, a ground floor or hollow plinth, and 13 upper floors. The maximum height of the buildings is planned at 44.93 metres.

ItemDetail
Total Units136 residential flats
Building Configuration2 Basements + Ground/Hollow Plinth + 13 Floors
Number of Blocks3 (Block A, B, and C)
Tallest Building Height44.93 metres
Total Built-up Area31,687.97 square metres
FSI Area18,052.63 square metres
Common Plot Area424.06 square metres

Layout and design

The project layout includes a peripheral margin of 6 metres and internal roads of 6 metres width. Separate entry and exit points are planned on the approach road. Block A and Block C are identical in their floor area, while Block B has a smaller footprint.

Parking is distributed across the hollow plinth and two basement levels. The total proposed parking space is 8,158.67 square metres, providing for 258 Equivalent Car Spaces (ECS). The basements are designed with a height greater than 4.5 metres to accommodate potential future mechanical parking systems.

Land and surroundings

The project is located at Khodiyar in the Daskroi taluk of Ahmedabad, Gujarat. It is situated at Town Planning Scheme No. 61 (Khoraj-Khodiyar), specifically on Sub Plot No. 81/2/1/B/2. Geotechnical investigations conducted in May 2024 involved two boreholes drilled to a depth of 25 metres. The soil profile consists of yellowish-brown, fine-grained silty clayey sand with gravel up to 22 metres, followed by sandy clays. No groundwater was encountered during the investigation.

Water, power and access

During the operation phase, the total water requirement is estimated at 127 kilolitres per day (KLD). Fresh water of 76 KLD will be sourced from the Ahmedabad Urban Development Authority (AUDA), while the remaining 51 KLD will be met through treated sewage for flushing and gardening.

Power will be supplied by the local grid, with a 100 KVA diesel generator (DG) set proposed for backup. Energy conservation measures include the installation of 59 KW solar power generation on the rooftops and the use of LED lighting for common areas.

Environmental safeguards

The applicant proposes an onsite Sewage Treatment Plant (STP) with a capacity of 150 KLD using Activated Sludge Process technology. Treated wastewater will be reused for flushing and landscaping, with any excess discharged into the AUDA drainage line.

For solid waste management, an Organic Waste Converter (OWC) with a capacity of 390 kg per day will be installed to treat wet waste. The resulting compost will be used for the greenbelt. Rainwater harvesting will be managed through two percolation wells. The planned greenbelt area covers 462.8 square metres and will include 106 trees.

Timeline

Environmental approval for the original proposal was granted on 22 December 2024. The project was subsequently transferred to Status Infra on 10 July 2026. An expansion application was filed in August 2026, which is currently under initial checks. Construction is expected to proceed in phases following the grant of necessary clearances.

Serenity Status site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Serenity Status: Site layout and floor plans for Block A (preview)🔒 Sign in free to see it
Site layout and floor plans for Block A
Serenity Status: Typical floor plans and terrace layout for Block B (preview)🔒 Sign in free to see it
Typical floor plans and terrace layout for Block B
Serenity Status: First basement parking layout and driveway plan (preview)🔒 Sign in free to see it
First basement parking layout and driveway plan
Serenity Status: Second basement parking layout showing STP and OWC locations (preview)🔒 Sign in free to see it
Second basement parking layout showing STP and OWC locations

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 81% of them.

116 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Khodiyar, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.