What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Surat, Gujarat

Pratishtha Classic

Pratishtha Classic is an approved building project in Abrama, Kamrej, Surat, Gujarat. The site covers 1.1 acres. Its stated project cost is ₹25 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Apr 2023).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Pratishtha Classic?

Pratishtha Classic is an approved building project in Abrama, Kamrej, Surat, Gujarat. The site covers 1.1 acres.

Who is building it?

The applicant is Amitabahen Zadafiya.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Apr 2023), as of 27 Nov 2026.

Where is it?

In Abrama, Kamrej, Surat, Gujarat.

How big is it?

It has a stated cost of ₹25 crore and a site of 1.1 acres.

When was it filed?

The application was filed on 17 Apr 2023.

Project details

StatusEnvironmental approval granted
Status since17 Apr 2023
Application filed17 Apr 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAmitabahen Zadafiya
Land area1.1 acres (0.4 ha)
Project cost₹25 crore
Village / localityAbrama
Taluk / tehsilKamrej
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-02328

What the filings say

What is planned

Pratishtha Classic is a proposed commercial and residential development on a plot of 0.44 hectares (1.08 acres). The applicant's project report describes a layout consisting of three buildings, designated as Blocks A, B, and C, each rising to 14 floors above a hollow plinth and two basement levels. The total built-up area for the project is 27,741.52 square metres.

The project will provide a total of 159 units, including 154 residential dwellings and 5 mercantile (shop) units. The residential component is distributed across the three blocks as follows:

The ground floor of Block A will house the 5 commercial shops, while the ground floors of Blocks B and C are dedicated to parking. The tallest building height is specified as 44.95 metres.

Layout and design

The site layout includes two basement levels for parking and services. The ground floor features a hollow plinth area, internal roads of 6.00 metres width, and a common plot area of 443.09 square metres. Each building is equipped with a fire lift and a regular lift. The terrace levels will house lift machine rooms and overhead water tanks with a capacity of 20,000 litres each.

Parking is distributed across the basements and ground floor. The total proposed parking area is 6,428.46 square metres, which includes 155 car parking spaces and 334 scooter spaces for the residential portion, and 1 car space and 12 scooter spaces for the commercial portion. This includes 13 designated spaces for physically disabled persons.

Water, power and access

The project's water management plan includes a 100 kilolitres per day (KLD) Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP). For rainwater harvesting, the applicant proposes two percolation wells. An underground water tank with a capacity of 2,46,000 litres is planned for the site.

Power will be supplied by the local grid, with Diesel Generator (DG) sets provided for emergency backup. The DG sets will be housed in the basement with acoustic enclosures. The project also includes a 50 KW rooftop solar energy system requiring 300 square metres of terrace space. Access to the site is provided via 12.00-metre wide Town Planning (TP) roads.

Environmental safeguards

The applicant has budgeted ₹1.67 crore for capital expenditure on environmental management, with an annual recurring cost of ₹19.20 lakh. This budget covers dust mitigation, noise control, the STP, an automatic Organic Waste Converter (OWC) with a capacity of 250 kg/day, and fire safety systems.

A green belt development plan is proposed covering 731.86 square metres (16.72% of the plot area). This includes 288.77 square metres of tree cover and 443.09 square metres of lawn. The applicant plans to plant 80 trees of species such as Asopalav, Gulmohar, Palm, Badam, and Neem.

Timeline

The applicant's Environmental Management Plan states that the entire project is expected to be completed within approximately four years. Installation of environmental management units will proceed in parallel with the building construction.

Pratishtha Classic site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Pratishtha Classic: Site layout: building blocks, internal roads, and common plot (preview)🔒 Sign in free to see it
Site layout: building blocks, internal roads, and common plot
Pratishtha Classic: Parking plan: ground floor and basement levels (preview)🔒 Sign in free to see it
Parking plan: ground floor and basement levels
Pratishtha Classic: Basement plans: 1st and 2nd basement levels (preview)🔒 Sign in free to see it
Basement plans: 1st and 2nd basement levels
Pratishtha Classic: Building A: Elevation and section plan (preview)🔒 Sign in free to see it
Building A: Elevation and section plan

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 79% of them.

162 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Abrama, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.