Project details
| Status | Initial checks |
|---|---|
| Status since | 21 Oct 2026 |
| Application filed | 4 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jayntibhai Ambalal Patel |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹70 crore |
| Village / locality | Bhadaj |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10651 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Sept 2026 (this page) | Initial checks | 1.2 acres | ₹70 crore |
| New project filed 26 Mar 2026 | More information requested | 1.2 acres | ₹70 crore |
What the filings say
The applicant, Jayntibhai Ambalal Patel, proposes the construction of 'Oryn Palatia', a residential project comprising two blocks, Block A and Block B. According to the project plans, the development will feature 21 residential floors above a ground-level hollow plinth and three basement levels dedicated to parking.
What is planned
The project is designed to provide a total of 119 residential units. Architectural sections indicate a total building height of approximately 69.93 metres to the terrace level, reaching 81.78 metres including the lift machine room and overhead water tank. The three basement levels and the ground floor are primarily allocated for parking and utility services.
| Item | Detail |
|---|---|
| Total Residential Units | 119 |
| Tallest Building Height | 21 Floors |
| Basement Levels | 3 |
| Common Plot Area | 467.43 sq. m. |
| STP Capacity | 120 KLD |
| Solar Power Installation | 97 KW |
| Planned Tree Plantation | 117 trees |
| Wet Waste Treatment | 250 kg/day |
Layout and design
The master plan shows the two blocks arranged around a central drive way and a common plot of 467.43 sq. m. The ground floor layout includes a fire control room, electric meter rooms, and equipment rooms. Access to the three basement levels is provided via ramps with a 1:7 slope. Residential units are planned from the first floor upwards, with specific floors (5th, 7th, 11th, 15th, and 20th) designated as refuge floors containing refuge balconies. The 21st floor features a different unit configuration with open terraces.
Water, power and access
The project's Environmental Management Plan (EMP) states that water for domestic and construction activities will be managed to minimize consumption, including the use of curing chemicals and thick cloth covers during construction. For the operation phase, a 120 kilolitres per day (KLD) Moving Bed Biofilm Reactor (MBBR) type Sewage Treatment Plant (STP) is proposed. Treated sewage will be reused for gardening and flushing within the premises, with any excess discharged into the municipal drainage line.
Power requirements will be partially met through a 97 KW rooftop solar system, requiring approximately 976.89 sq. m. of terrace space. The site is accessible via two 18-metre wide Town Planning Scheme (TPS) roads.
Environmental safeguards
The applicant proposes several environmental mitigation measures:
- Waste Management: An automatic Organic Waste Converter (OWC) with a capacity of 250 kg/day will be installed in a 12 sq. m. area to treat wet waste. Separate bins will be provided for dry and wet waste segregation at the source.
- Greenbelt: A total of 117 trees are to be planted within the premises as per guidelines.
- Rainwater Harvesting: The plan includes a collection system with two percolation wells for groundwater recharge. Roof top rain water will be collected in an RCC tank for reuse in gardening and firefighting.
- Pollution Control: During construction, the site will be barricaded with 15-foot high sheets, and water sprinkling will be used for dust suppression. D.G. sets will be provided with acoustic enclosures.
Land and surroundings
The project is located on Final Plot No. 137/1 of TPS No. 301 in Bhadaj, covering 0.47 hectares (1.16 acres). Land documents filed by the applicant mention a legal matter, Special Civil Suit No. 412/2022, in which parties were directed to maintain status quo regarding the property as of late 2022.
'ORYN PALATIA', Residential Building Construction Project site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 75% of them.
155 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhadaj, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 'ORYN PALATIA', Residential Building construction project — more information requested, 0 m away
- Anantara Alora — environmental approval granted, 250 m away
- Sivesta Retreat — environmental approval granted, 300 m away
- Camellia — initial checks, 350 m away
- Camellia — environmental approval granted, 350 m away
- The Altitude — environmental approval granted, 450 m away
- Alabhya — environmental approval granted, 550 m away
- Alabhya — environmental approval granted, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.