Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 19 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Shivox Polymer |
| Land area | 3,900 m² |
| Project cost | ₹3 crore |
| Village / locality | Bela Rangpar |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11019 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Sept 2026 (this page) | Environmental approval granted | 1 acre | ₹3 crore |
| Early planning filed 7 Feb 2026 | Cleared for impact study | 1 acre | ₹3 crore |
In context
76 applications in Morbi since January 2022 are in the same category (Industry): 55 approved, 16 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1 acre, this one is smaller than 71% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bela Rangpar, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Organic Chemicals Manufacturing Unit of M/s. Shivox Polymer — cleared for impact study, 0 m away
- Yogesh Park SR & Siddhi Vinayak Township & Siddhi Vinayak CNG to Lioli… — forest land use approved, 1.9 km away
- Proposed Active Pharmaceutical Ingredients and Intermediates project and Resin… — environmental approval granted, 2.3 km away
- 6" Dia NB Steel Gas Pipeline Connectivity from FDODO Satyam CNG Station,… — lapsed, 3.4 km away
- Proposed Expansion in Existing Inorganic (Non-Ec) Products by Addition of… — cleared for impact study, 3.4 km away
- Diversion of 0.0024 Ha. of PF Land for laying of 6" Dia NB Steel Gas Pipeline… — forest land use approved, 3.6 km away
- PROPOSED EXPANSION BY ADDITION OF SYNTHETIC ORGANIC CHEMICALS (CERAMIC BINDER)… — cleared for impact study, 3.7 km away
- Industrial project by M/S. Reolaxe Lami Art LLP — returned to applicant, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.