One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Integrated Paint Manufacturing Unit from 10,530 MT/Month to 19,600…
Project details
| Official title | Proposed Expansion of Integrated Paint Manufacturing Unit from 10,530 MT/Month to 19,600 MT/Month along with addition of Plot having area of 34,937.64 m2 by M/s. Kansai Nerolac Paints Limited at Plot No. C-385 + C-386 + C-390/1, GIDC Saykha, Taluka - Vagra, Dist - Bharuch, Gujarat - 392140. |
|---|---|
| Status | Lapsed |
| Status since | 6 Sept 2026 |
| Application filed | 20 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kansai Nerolac Paints Limited |
| Land area | 46.2 acres (18.7 ha) |
| Project cost | ₹940 crore |
| Village / locality | Aragama |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11076 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 7 Aug 2026 | Under environmental review | 46.2 acres | ₹940 crore |
| Early planning filed 20 Jul 2026 (this page) | Lapsed | 46.2 acres | ₹940 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 46.2 acres, this one is larger than 87% of them.
42 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aragama, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to ONGC Plans 78 Oil and Gas Wells in Bharuch, Gujarat (12.8 km away).
Other projects nearby
- Proposed Expansion of Integrated Paint Manufacturing Unit from 10,530 MT/Month… — under environmental review, 0 m away
- Industrial project by M/s. Maldeep Catalysts Pvt. Ltd. — environmental approval granted, 350 m away
- Diversion of 0.080 Ha. Protected Forest Land for Construction of Approach Road… — forest land use approved, 350 m away
- Industrial project by M/s. Dasaldhan Pharmachem Private Limited — environmental approval granted, 500 m away
- Industrial project by M/s. Dasaldhan Pharmachem Private Limited — cleared for impact study, 500 m away
- Industrial project by Gutsalve Lifesciences Private Limited — under environmental review, 500 m away
- Panacea Intermediates — under environmental review, 600 m away
- Panacea Intermediates — withdrawn, 600 m away
All 5 Kansai Nerolac Paints projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.