Under environmental reviewPower · Surat, Gujarat

Proposed 750 MW Lignite Power Plant (Unit-1, 2 & 3) by Gujarat Industries Power Company Limited

Proposed 750 MW Lignite Power Plant (Unit-1, 2 & 3) by Gujarat Industries Power Company Limited is a proposed power project in Dungri, Mangrol, Surat, Gujarat. The site covers 350.5 acres. Its stated project cost is ₹8,828 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 19 Nov 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed 750 MW Lignite Power Plant (Unit-1, 2 & 3) by Gujarat Industries Power Company Limited is a proposed power project in Dungri, Mangrol, Surat, Gujarat. The site covers 350.5 acres.

Who is building it?

The applicant is Gujarat Industries Power Company Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Dungri, Mangrol, Surat, Gujarat.

How big is it?

It has a stated cost of ₹8,828 crore and a site of 350.5 acres.

When was it filed?

The application was filed on 20 Jul 2026.

Project details

Official titleProposed 750 MW Lignite Power Plant (Unit-1, 2 & 3) at Village Vastan, Jhakharda and Dungri, Taluka Mangrol, District Surat, State-Gujarat by Gujarat Industries Power Company Limited
StatusUnder environmental review
Status since19 Nov 2026
Application filed20 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantGujarat Industries Power Company Limited
Land area350.5 acres (141.9 ha)
Project cost₹8,828 crore
Village / localityDungri
Taluk / tehsilMangrol
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-11256

In context

39 applications in Surat since January 2022 are in the same category (Power): 22 approved, 13 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 350.5 acres, this one is larger than 94% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dungri, Mangrol, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gujarat Industries Power Company Limited in Surat

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.