Quick answers
What is Praarambh?
Praarambh is a proposed building project in Tarapur, Gandhinagar, Gujarat. The site covers 0.9 acres.
Who is building it?
The applicant is Labh Developers.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Tarapur, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹67.9 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 6 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 6 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Labh Developers |
| Land area | 3,700 m² |
| Project cost | ₹67.9 crore |
| Village / locality | Tarapur |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11378 |
What the filings say
What is planned
Labh Developers proposes the construction of a residential and commercial project named "Praarambh" in Tarapur, Gandhinagar. The applicant's project report and architectural plans detail a development consisting of four distinct blocks (A, B, C, and D) with a maximum height of 44.90 to 51.90 metres.
The project components include:
- Blocks A and B: Combined residential and commercial structures featuring 19 shops on the ground floor and 112 residential units across 14 floors.
- Block C: A residential building with 70 units across 14 floors.
- Block D: A residential building with 56 units across 14 floors.
- Club House: A dedicated ground-floor facility for residents.
Residential units are primarily designed as 3-BHK apartments. The total built-up area for the project is 26,992.51 square metres, with a total Floor Space Index (FSI) area of 13,463.33 square metres. The commercial component consists of 19 shops located on the ground floor of Blocks A and B.
Layout and design
The site layout is organized around a central common plot of 375.08 square metres (15.21 m x 24.66 m). The buildings are arranged to maintain a 6.00-metre wide clear margin on all sides. Access is provided via an 18.00-metre wide Town Planning Scheme (TPS) road.
Parking is distributed across three basement levels and hollow plinth areas on the ground floor. The design includes dedicated entrance foyers for each block and a ramp system for basement access. A 1.80-metre wide pathway is planned for internal circulation.
| Item | Detail |
|---|---|
| Total Units | 238 Residential + 19 Commercial |
| Tallest Building | 14 Floors above ground |
| Basement Levels | 3 |
| Common Plot Area | 375.08 square metres |
| Tree Plantation | 94 trees |
| Solar Power Capacity | 64.28 KW |
| Sewage Treatment Plant | 150 KLD MBBR type |
Water, power and access
The project's water requirements will be managed through municipal supply and internal systems. A 150 Kilo Litres per Day (KLD) Sewage Treatment Plant (STP) using Moving Bed Biofilm Reactor (MBBR) technology is planned, occupying 120 square metres. For rainwater management, the applicant proposes one percolation well and a collection system.
Power will be sourced from the local grid, supplemented by a 64.28 KW rooftop solar installation covering 915.62 square metres of terrace space. Emergency power will be provided by Diesel Generator (DG) sets housed in acoustic enclosures.
Environmental safeguards
The Environment Management Plan (EMP) allocates a capital cost of ₹294.42 lakh. Key measures include:
- Waste Management: An automatic Organic Waste Converter (OWC) to handle 548 kg/day of solid waste (219 kg wet, 329 kg dry).
- Air and Noise: Dust mitigation measures during construction and acoustic enclosures for DG sets.
- Green Belt: Plantation of 94 trees and lawn development.
- Corporate Environment Responsibility (CER): The applicant has earmarked ₹135.88 lakh for the development of a lake in Uvarsad village, including cleaning, fencing, walkways, LED lighting, and Miyawaki plantation.
Timeline
The implementation plan for capital expenditure spans three years, starting from 2026-27 through 2028-29, with the largest portion of the budget (₹208.47 lakh) scheduled for the final year.
Praarambh site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 88% of them.
138 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tarapur, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Madhav Aishvaryam — environmental approval granted, 100 m away
- Madhav Aishvaryam — environmental approval granted, 100 m away
- Sahstra Swaraj — lapsed, 250 m away
- Sahajanand Shikhar — environmental approval granted, 300 m away
- Shailya Nivasa — environmental approval granted, 350 m away
- Proposed Expansion of Commercial Project "Vihaan 273" by Ahaana Infracon — environmental approval granted, 400 m away
- Keshav Parisar — environmental approval granted, 450 m away
- Keshav Parisar — more information requested, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.