Environmental approval grantedBuildings & townships · Gandhinagar, Gujarat

Sahajanand Shikhar

Sahajanand Shikhar is an approved building project in Sargasan, Gandhinagar, Gujarat. The site covers 1.6 acres. Its stated project cost is ₹49.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Jul 2023).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Sahajanand Shikhar?

Sahajanand Shikhar is an approved building project in Sargasan, Gandhinagar, Gujarat. The site covers 1.6 acres.

Who is building it?

The applicant is Akshar Enterprise.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 4 Jul 2023), as of 27 Nov 2026.

Where is it?

In Sargasan, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹49.2 crore and a site of 1.6 acres.

When was it filed?

The application was filed on 4 Jul 2023.

Project details

StatusEnvironmental approval granted
Status since4 Jul 2023
Application filed4 Jul 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAkshar Enterprise
Land area1.6 acres (0.7 ha)
Project cost₹49.2 crore
Village / localitySargasan
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01086

What the filings say

What is planned

Akshar Enterprise proposes the construction of Sahajanand Shikhar, a residential and commercial project in Sargasan, Gandhinagar. The applicant's project report describes a development consisting of four building blocks (A, B, C, and D) with a maximum height of 13 floors above ground level.

The project is designed to accommodate 121 residential units and 10 commercial shops. The residential units are distributed across the four blocks as follows:

The 10 commercial shops are located on the ground floor of Block A. The total built-up area for the project is 23,203.32 square metres, with a total used Floor Space Index (FSI) area of 14,607.91 square metres.

Layout and design

The project layout includes two basement levels dedicated to parking. The ground floor features a hollow plinth for additional parking, the commercial shops in Block A, and residential components in other blocks. A 6.00-metre wide internal approach road provides access within the site.

The design incorporates two common plots: Common Plot 1 (446.68 square metres) and Common Plot 2 (223.56 square metres), totaling 670.24 square metres. The buildings will be equipped with two lifts per block, including one designated fire lift.

Water, power and access

The project's water requirement will be met through the Gandhinagar Urban Development Authority (GUDA) supply. The applicant plans to install a Sewage Treatment Plant (STP) with a capacity of 80 kilolitres per day (KLD). Treated sewage will be reused for flushing and gardening within the premises, with the surplus discharged into the GUDA drainage line.

Power will be sourced from the local electricity grid. A Diesel Generator (DG) set with an acoustic enclosure will be provided for emergency backup. For renewable energy, the applicant proposes a 126 kW rooftop solar system consisting of 252 solar panels, covering approximately 1,262.93 square metres of the terrace area.

Vehicle access is provided via a 24.00-metre wide Town Planning Scheme (TPS) road and an 18.00-metre wide TPS road. The parking plan includes provisions for mechanical parking in the basements to meet the required capacity.

Environmental safeguards

The applicant has budgeted ₹332.90 lakh for capital expenditure on environmental management and ₹29.95 lakh for annual recurring costs. Key measures include:

Key Figures

ItemDetail
Total Built-up Area23,203.32 sq. m.
Total FSI Area14,607.91 sq. m.
Residential Units121
Commercial Units10
Maximum Floors13 Floors + 2 Basements
STP Capacity80 KLD
Solar Power Capacity126 kW
Greenbelt Area670.24 sq. m.
Estimated Trees85
CER Budget₹98.40 lakh

Sahajanand Shikhar site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Sahajanand Shikhar: Site layout: building blocks, roads, and common plots (preview)🔒 Sign in free to see it
Site layout: building blocks, roads, and common plots
Sahajanand Shikhar: Parking layout plan for ground level (preview)🔒 Sign in free to see it
Parking layout plan for ground level
Sahajanand Shikhar: Basement parking plans showing mechanical parking layout (preview)🔒 Sign in free to see it
Basement parking plans showing mechanical parking layout
Sahajanand Shikhar: Building elevation and sectional view (preview)🔒 Sign in free to see it
Building elevation and sectional view

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is larger than 59% of them.

139 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sargasan, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.