Project details
| Official title | Construction of Factory Building for Non-Alcoholic Beverages Manufacturing Plant by Stellar Manufacturers Pvt. Ltd. |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Jan 2026 |
| Application filed | 9 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Stellar Manufacturers Private Limited |
| Use | Industrial |
| Towers | 10 |
| Parking spaces | 171 |
| Land area | 32.2 acres (13 ha) |
| Built-up area | 61,670 m² (6,63,810 sq ft) |
| Plot area | 1,30,432 m² (14,03,957 sq ft) |
| Project cost | ₹895 crore |
| Village / locality | Mudarda |
| Taluk / tehsil | Jotana |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11663 |
In context
33 applications in Mahesana since January 2022 are in the same category (Buildings & townships): 25 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 32.2 acres, this one is larger than 69% of them.
Where it is
Mudarda, Jotana, Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Heavy Metal and Tubes (India) Pvt. Ltd. — cleared for impact study, 5.8 km away
- PROPOSED PROJECT FOR SYNTHETIC ORGANIC CHEMICALS [DYE INTERMEDIATES]… — cleared for impact study, 5.9 km away
- Industrial project by M/s. ANBUVA PHARMA PRIVATE LIMITED — environmental approval granted, 6.3 km away
- Industrial project by M/s. Oryn Healthcare LLP — environmental approval granted, 6.4 km away
- Industrial project by M/s. Oryn Healthcare LLP — cleared for impact study, 6.4 km away
- Approach road to connect Kanaiya Exports Pvt Ltd, village Ganeshpura, District… — forest land use approved, 6.6 km away
- Proposed new project of Manufacturing of Synthetic Organic Chemicals(API,… — cleared for impact study, 7.4 km away
- Environment Clearance for Proposed Green Field Project for Manufacturing of… — cleared for impact study, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.