Quick answers
What is this project?
Telecom Network in Ta. Jamnagar Rural/Lalpur and surrounding area is a lapsed telecom project in Jogvad, Lalpur, Jamnagar, Gujarat. It seeks 0.5 acres of forest land.
Who is building it?
The applicant is Mohammad Irfan Shaikh.
Has it been approved?
No. The application was lapsed on 26 Dec 2024, so it is no longer under consideration.
Where is it?
In Jogvad, Lalpur, Jamnagar, Gujarat.
How big is it?
It has a stated cost of ₹40 lakh and 1,940 m² of forest land.
When was it filed?
The application was filed on 22 Nov 2024.
Project details
| Official title | Telecom Network in Ta. Jamnagar Rural/Lalpur and surrounding area in Jamnagar District (Khavdi Reliance gate– Padana Patiya NH-151A Road) Diversion of 0.194 ha. of Protected Forest Land i.e. roadside plantation declared as protected forest for laying of 40MM dia. HDPE pipe for Khavdi Reliance gate– Padana Patiya NH-151A Road (LHS) in Taluka: Jamnagar Rural/Lalpur District Jamnagar in Gujarat (Bharti Airtel Limited). |
|---|---|
| Status | Lapsed |
| Status since | 26 Dec 2024 |
| Application filed | 22 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mohammad Irfan Shaikh |
| Forest land | 1,940 m² |
| Project cost | ₹40 lakh |
| Village / locality | Jogvad |
| Taluk / tehsil | Lalpur |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12086 |
In context
8 applications in Jamnagar since January 2022 are in the same category (Telecom): 1 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jogvad, Lalpur, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Nayara Energy Seeks to Amend Clearance for its 60-Million-Tonne Refinery Expansion in Gujarat (8.8 km away).
Other projects nearby
- Diversion of 0.1936 HA. of PF land for Dom-Com Connectivity From Reliance old… — under forest review, 350 m away
- Development of Hospital by Reliance Industries Limited at Jamnagar — initial checks, 950 m away
- Proposed Residential Township by Reliance Industries Limited at Jamnagar — environmental approval granted, 2.5 km away
- Proposed Residential Township by Reliance Industries Limited at Jamnagar — cleared for impact study, 2.5 km away
- Reliance Industries Limited – Amendment in EC for higher production capacity… — withdrawn, 2.9 km away
- Reliance Industries Limited – Increase in crude processing capacity from 33… — lapsed, 3.3 km away
- Shri Ramdevsinh Ranjitsinh Jadeja (Padana Blacktrap Block-01) — environmental approval granted, 3.5 km away
- Lakhmanbhai Meragbhai Kambariya — environmental approval granted, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.