Quick answers
What is Chorvadi Head Work Inlet and Outlet Pipe?
Chorvadi Head Work Inlet and Outlet Pipe is an approved pipeline project in Navagam, Junagadh, Gujarat. The site covers 0 acres.
Who is building it?
The applicant is Deputy Executive Engineer.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 13 Aug 2026), as of 27 Nov 2026.
Where is it?
In Navagam, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹5 lakh; a site of 0 acres and 60 m² of forest land.
When was it filed?
The application was filed on 20 Jan 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 13 Aug 2026 |
| Application filed | 20 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Deputy Executive Engineer |
| Land area | 100 m² |
| Forest land | 60 m² |
| Project cost | ₹5 lakh |
| Village / locality | Navagam |
| Taluk / tehsil | Junagadh |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12128 |
In context
21 applications in Junagadh since January 2022 are in the same category (Pipelines): 6 approved, 5 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
Where it is
Navagam, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhupatbhai Bhikhabhai Ghul — environmental approval granted, 5.6 km away
- Junagadh-Khadiya Road SH-30 For Approach access — forest land use approved, 6.4 km away
- Laying UG OFC Cable along Bhesan-Bilakha road of Junagadh dist. — lapsed, 6.7 km away
- Amul Cement Industries — returned to applicant, 7.6 km away
- Jadeja Lakhubhai V(Block-A) — environmental approval granted, 7.9 km away
- 4 laning of Junagadh-Khadiya Road — more information requested, 7.9 km away
- Milan Raydhanbhai Chavda — not approved, 8.1 km away
- Nishitbhai Ashvinbhai Bhetariya (Block –A) — environmental approval granted, 8.4 km away
More from Deputy Executive Engineer in Junagadh
- Girnar Water Supply Scheme (Hasnapur Dam to Ambaji Temple on Girnar Hill) — more information requested
- Girnar Water Supply Scheme (Hasnapur Dam to Ambaji Temple on Girnar Hill) — more information requested
- Girnar Water Supply Scheme (Hasnapur Dam to Ambaji Temple on Girnar Hill) — lapsed
- Laying UG Drinking water pipeline from Kenedipur HW pipeline — forest land use approved
- Girnar Drinking Water Pipeline — lapsed
- Kenedipur Headwork — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.