Quick answers
What is this project?
Girnar Water Supply Scheme (Hasnapur Dam to Ambaji Temple on Girnar Hill) is a lapsed pipeline project in Hasnapur, Junagadh, Gujarat. The site covers 33.9 acres.
Who is building it?
The applicant is Deputy Executive Engineer.
Has it been approved?
No. The application was lapsed on 3 Jun 2026, so it is no longer under consideration.
Where is it?
In Hasnapur, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹93.4 crore; a site of 33.9 acres and 5.3 acres (2.1 ha) of forest land.
When was it filed?
The application was filed on 28 Apr 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Girnar Water Supply Scheme (Hasnapur Dam to Ambaji Temple on Girnar Hill)
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Jun 2026 |
| Application filed | 28 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Deputy Executive Engineer |
| Land area | 33.9 acres (13.7 ha) |
| Forest land | 5.3 acres (2.1 ha) |
| Project cost | ₹93.4 crore |
| Village / locality | Hasnapur |
| Taluk / tehsil | Junagadh |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13522 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 May 2026 | More information requested | 5 acres | ₹93.4 crore |
| New project filed 14 May 2026 | More information requested | 5 acres | ₹93.4 crore |
| New project filed 28 Apr 2026 (this page) | Lapsed | 33.9 acres | ₹93.4 crore |
In context
21 applications in Junagadh since January 2022 are in the same category (Pipelines): 6 approved, 5 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 33.9 acres, this one is larger than 89% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hasnapur, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Girnar Drinking Water Pipeline — lapsed, 0 m away
- Diversion of 0.1636ha Forest Land For Pipeline laying from Hasnapur dam… — more information requested, 550 m away
- Diversion of 0.1636ha Forest Land for Repairing of Bpt (Back Pressure Tank)… — more information requested, 550 m away
- Alpesh Parvishbhai Chavda — not approved, 700 m away
- Diversion of 0.0096ha. Forest Land For Repairing of B.P.T. (Back Pressure… — lapsed, 700 m away
- Diversion of 0.0096ha. Forest Land For Repairing of B.P.T. (Back Pressure… — more information requested, 700 m away
- Girnar Water Supply Scheme (Hasnapur Dam to Ambaji Temple on Girnar Hill) — more information requested, 2.7 km away
- Greencare BMW Services — under environmental review, 3.7 km away
More from Deputy Executive Engineer in Junagadh
- Chorvadi Head Work Inlet and Outlet Pipe — forest land use approved
- Laying UG Drinking water pipeline from Kenedipur HW pipeline — forest land use approved
- Girnar Drinking Water Pipeline — lapsed
- Kenedipur Headwork — forest land use approved
- Junagadh-Vanthali RSS — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.