Quick answers
What is Diversion of Protected Forest Land for Water Pipeline?
Diversion of Protected Forest Land for Water Pipeline is an approved water and irrigation project in Karambele, Umbergaon, Valsad, Gujarat. The site covers 0.9 acres.
Who is building it?
The applicant is Gujarat Water Supply and Sewerage Board.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 2 Jan 2025), as of 27 Nov 2026.
Where is it?
In Karambele, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹76.8 crore; a site of 0.9 acres and 3,570 m² of forest land.
When was it filed?
The application was filed on 17 Apr 2024.
Project details
| Official title | Diversion of Protected Forest Land for Water Pipeline in Valsad District Forest Area Under Augmentation of Umargam Rwss Project. |
|---|---|
| Status | Forest land use approved |
| Status since | 2 Jan 2025 |
| Application filed | 17 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Gujarat Water Supply and Sewerage Board |
| Land area | 3,600 m² |
| Forest land | 3,570 m² |
| Project cost | ₹76.8 crore |
| Village / locality | Karambele |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12314 |
In context
9 applications in Valsad since January 2022 are in the same category (Water & irrigation): 6 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval.
66 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karambele, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vehicular Underpass (VUP) near Daman Ganga River (Ch. 368.850 km) including… — forest land use approved, 1.6 km away
- Proposed Waste Water Disposal Pipeline From Cetp Vapi to Land Fall Point at… — lapsed, 1.6 km away
- Change of Name In Forest Clearance from Reliance Gas Pipeline Ltd to Reliance… — lapsed, 3 km away
- Change of Name in Forest Clearance from Reliance Gas Pipeline Ltd to Reliance… — lapsed, 3 km away
- Smt. Nayanaben Nareshbhai Halpati Re-appraisal Area- 1.00.00 Survey no.- 164,… — lapsed, 3 km away
- Gas Distribution Network in Umargam & Dharampur Taluka of Valsad GA (Domestic… — forest land use approved, 3 km away
- Angam Blacktrap Mining Project, Survey No 62/2 Paiki proposed by Mukeshbhai… — not approved, 3.3 km away
- Angam Blacktrap Mining Project, Survey No 62/2 Paiki — withdrawn, 3.3 km away
More from Gujarat Water Supply and Sewerage Board in Valsad
- Sanjan RWSS — forest land use approved
All 26 Gujarat Water Supply and Sewerage Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.