What is this project?
Gas Distribution Network in Umargam & Dharampur Taluka of Valsad GA (Domestic Connection at Khatalwada Connectivity & Dasera Pati, Malanpada Dharampur Connectivity) is an approved pipeline project in Bilpudi, Dharampur, Valsad, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 3 Nov 2023), as of 27 Nov 2026.
Where is it?
In Bilpudi, Dharampur, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹9 lakh; a site of 0.1 acres and 320 m² of forest land.
When was it filed?
The application was filed on 20 Apr 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 3 Nov 2023 |
| Application filed | 20 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 300 m² |
| Forest land | 320 m² |
| Project cost | ₹9 lakh |
| Village / locality | Bilpudi |
| Taluk / tehsil | Dharampur |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14168 |
In context
35 applications in Valsad since January 2022 are in the same category (Pipelines): 22 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.1 acres, this one is smaller than 83% of them.
152 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bilpudi, Dharampur, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Smt. Nayanaben Nareshbhai Halpati Re-appraisal Area- 1.00.00 Survey no.- 164,… — lapsed, 250 m away
- Change of Name In Forest Clearance from Reliance Gas Pipeline Ltd to Reliance… — lapsed, 1.1 km away
- Change of Name in Forest Clearance from Reliance Gas Pipeline Ltd to Reliance… — lapsed, 1.1 km away
- Proposed Residential Cum Commercial Building Construction Project Sun County… — initial checks, 1.3 km away
- Proposed Residential cum Commercial Project Suncity 2 by Shree Arjunbhai… — environmental approval granted, 1.6 km away
- Proposed Residential cum Commercial Project Suncity 2 by Shree Arjunbhai… — environmental approval granted, 1.6 km away
- Proposed Expansion in Construction of "Residential Cum Commercial Project –… — environmental approval granted, 1.7 km away
- "Proposed Residential Cum Commercial Building Construction Project" by Blue… — withdrawn, 1.8 km away
More from Gujarat Gas Limited in Valsad
- Diversion of 0.03268 HA. of PF land for Reliable Packaging & Ayurvedic College… — more information requested
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested
- Gas Distribution Network in Valsad Taluka & Surrounding Areas, Diversion of… — lapsed
- Diversion of 0.1544 Ha. protected forest land for laying 125/90 mm dia. MDPE… — lapsed
- Diversion of 0.0508 Hectare Protected Forest Land for Laying 125/90 Mm… — lapsed
- Permission for laying 4" dia. steel & 90 mm dia. PE pipeline along NH-48 &… — forest land use approved
29 Gujarat Gas projects in Valsad
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.