Quick answers
What is this project?
Diversion of 0.132 ha. for Engineering, Procurement And Construction (EPC) for Providing Irrigation Water For Filling 45 Village Pond (45 Villages) of Surendranagar District. Pipeline by Lifting Water from Dholi-Dhaja Dam Including Supplying and Laying M.S, D.I. And H.D.P.E. Pipeline of Different Dia with All Allied Works. (Package 2) is a proposed pipeline project in Vadadhra, Muli, Surendranagar, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Executive Engineer Sauni Yojna Division Rajkot.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Vadadhra, Muli, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹324.2 crore; a site of 0.3 acres and 1,320 m² of forest land.
When was it filed?
The application was filed on 5 Mar 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 6 Aug 2026 |
| Application filed | 5 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Executive Engineer Sauni Yojna Division Rajkot |
| Land area | 1,300 m² |
| Forest land | 1,320 m² |
| Project cost | ₹324.2 crore |
| Village / locality | Vadadhra |
| Taluk / tehsil | Muli |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12317 |
In context
26 applications in Surendranagar since January 2022 are in the same category (Pipelines): 16 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 0.3 acres, this one is larger than 52% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vadadhra, Muli, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Surendranagar, Chamraj to Velavadar, Sara to Thangadh Length 46725 Meter i.e.… — lapsed, 3.4 km away
- (1) Yes Bank to Tank chowk Length 0/100 KMS i.e. 0.01 ha. (2) Chamaraj to… — more information requested, 5.6 km away
- Sudhirbhai Zaverbhai Rangani (Dudhai Fire Clay Mine) — environmental approval granted, 6.1 km away
- Engineering, Procurement And Construction (EPC) Contract For Providing… — more information requested, 7.1 km away
- Industrial project by Ars Premium Cement PVT. LTD. — lapsed, 8.2 km away
- 66 KV LILO Transmission Line from 66 KV Virpar Substation to 66 KV Bhavanigadh… — more information requested, 8.6 km away
- Shri Varu Ranabhai Ambabhai — environmental approval granted, 11.1 km away
- Shri Varu Ranabhai Ambabhai (Sara Fire Clay Mine) — environmental approval granted, 11.5 km away
More from Executive Engineer Sauni Yojna Division Rajkot in Surendranagar
- Engineering, Procurement And Construction (EPC) Contract For Providing… — more information requested
- Laying Irrigation Under Ground Water Pipeline for Filling of Various… — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.