Under forest reviewPipelines · Surendranagar, Gujarat

Laying Ug Water Pipeline (To Provide 100 Mld Water to Dholera Sir) in Various Forest Land Pf Land

Laying Ug Water Pipeline (To Provide 100 Mld Water to Dholera Sir) in Various Forest Land Pf Land is a proposed pipeline project in Bhojpara, Limbdi, Surendranagar, Gujarat. The site covers 2.3 acres. Its stated project cost is ₹373.4 crore. As of 27 Nov 2026, its status is “Under forest review” (since 19 Nov 2026).

See it on the live map All projects in Surendranagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Laying Ug Water Pipeline (To Provide 100 Mld Water to Dholera Sir) in Various Forest Land Pf Land is a proposed pipeline project in Bhojpara, Limbdi, Surendranagar, Gujarat. The site covers 2.3 acres.

Who is building it?

The applicant is Sardar Sarovar Narmada Nigam Ltd.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Bhojpara, Limbdi, Surendranagar, Gujarat.

How big is it?

It has a stated cost of ₹373.4 crore; a site of 2.3 acres and 2.3 acres (0.9 ha) of forest land.

When was it filed?

The application was filed on 6 Oct 2026.

Project details

Official titleProposal for Laying Ug Water Pipeline (To Provide 100 Mld Water to Dholera Sir) in Various Forest Land Pf Land in Ahmedabad and Surendranagar District
StatusUnder forest review
Status since19 Nov 2026
Application filed6 Oct 2026
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantSardar Sarovar Narmada Nigam Ltd
Land area2.3 acres (0.9 ha)
Forest land2.3 acres (0.9 ha)
Project cost₹373.4 crore
Village / localityBhojpara
Taluk / tehsilLimbdi
DistrictSurendranagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12329

In context

26 applications in Surendranagar since January 2022 are in the same category (Pipelines): 16 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 2.3 acres, this one is larger than 78% of them.

Where it is

Bhojpara, Limbdi, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.