Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Aug 2026 |
| Application filed | 9 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Sabarmati Gas Limited |
| Land area | 100 m² |
| Forest land | 140 m² |
| Project cost | ₹10 lakh |
| Village / locality | Pilvai |
| Taluk / tehsil | Vijapur |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12330 |
In context
33 applications in Mahesana since January 2022 are in the same category (Pipelines): 11 approved, 8 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pilvai, Vijapur, Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Maruti Steel Re Rolling Mill — cleared for impact study, 800 m away
- Industrial project by M/s. Shakti Metals — cleared for impact study, 1 km away
- Iskcon Metal — cleared for impact study, 1 km away
- Industrial project by M/s. Radhe Industries — cleared for impact study, 1.1 km away
- Industrial project by M/s. Pragati Steel Industries — cleared for impact study, 1.3 km away
- Industrial project by Ganesh Steel Re-Rolling Mills Pvt Ltd. — cleared for impact study, 1.8 km away
- Umiya Steel Industries — cleared for impact study, 3.3 km away
- Sun Steel Rolling Mill — cleared for impact study, 3.4 km away
More from Sabarmati Gas Limited in Mahesana
- Proposed 125/90/63 dia MDPE gas pipeline (Area - 0.0182 Ha) along - across — lapsed
- Laying of 63 mm Dia MDPE underground natural gas pipeline along the Unjha -… — lapsed
- Laying of 125/90 mm Dia MDPE (Area - 0.0884 Ha) along & across in Taluka Kadi… — lapsed
- Permission to Lay 125/90/63 Mm Dia Mdpe Gas Pipeline Connectivity's Along &… — lapsed
- Proposed underground 125/90/63 mm Dia MDPE Gas Pipeline Connectivity in Taluka… — lapsed
- Proposed 32/63 mm Dia MDPE Gas Pipeline laying to supply Natural Gas — forest land use approved
28 Sabarmati Gas projects in Mahesana
All 76 Sabarmati Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.