Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Aug 2026 |
| Application filed | 27 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Sabarmati Gas Limited |
| Land area | 900 m² |
| Forest land | 880 m² |
| Project cost | ₹10 lakh |
| Village / locality | Budasan |
| Taluk / tehsil | Kadi |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12456 |
In context
33 applications in Mahesana since January 2022 are in the same category (Pipelines): 11 approved, 8 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.2 acres, this one is smaller than 72% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Budasan, Kadi, Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Vikram Aroma Limited — lapsed, 2.4 km away
- Environmental Clearance (EC) for Exploratory Drilling of Two Exploratory wells… — initial checks, 2.4 km away
- Proposed 125/90/63 dia MDPE gas pipeline (Area - 0.0182 Ha) along - across — lapsed, 2.9 km away
- Industrial project by Sun Mark Stainless Pvt. Ltd. — cleared for impact study, 2.9 km away
- Industrial project by Asian Tubes Pvt Ltd. — lapsed, 3.2 km away
- Industrial project by Asian Tubes Pvt. Ltd. — cleared for impact study, 3.2 km away
- Industrial project by M/s. Resonance Organics Pvt. Ltd. — under environmental review, 3.2 km away
- Laying of Pro.66kv Ug Cable Line for 66KV Vadavi - Kadi Line With 1 Core 630… — forest land use approved, 3.4 km away
More from Sabarmati Gas Limited in Mahesana
- Proposed 125/90/63 dia MDPE gas pipeline (Area - 0.0182 Ha) along - across — lapsed
- Laying of 63 mm Dia MDPE underground natural gas pipeline along the Unjha -… — lapsed
- Permission to Lay 125/90/63 Mm Dia Mdpe Gas Pipeline Connectivity's Along &… — lapsed
- Permission For Laying 90 mm Dia MDPE Gas Pipeline for PEP Food Connectivity. — lapsed
- Proposed underground 125/90/63 mm Dia MDPE Gas Pipeline Connectivity in Taluka… — lapsed
- Proposed 32/63 mm Dia MDPE Gas Pipeline laying to supply Natural Gas — forest land use approved
28 Sabarmati Gas projects in Mahesana
All 76 Sabarmati Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.