Quick answers
What is this project?
Approach Road for New Retail Outlet on NH-53 at Km.66+143 (Between Km 66+120 to Km 66+165) on Left Hand Side Block Survey No Na 580/Ap2, Village- Afva, Taluka : Bardoli, District : Surat (0.0045 Ha) is a lapsed fuel station in Afva, Bardoli, Surat, Gujarat. It seeks 0 acres of forest land.
Who is building it?
The applicant is Hirenkumar Natvarbhai Mistry.
Has it been approved?
No. The application was lapsed on 10 Aug 2025, so it is no longer under consideration.
Where is it?
In Afva, Bardoli, Surat, Gujarat.
How big is it?
It has a stated cost of ₹1 crore and 50 m² of forest land.
When was it filed?
The application was filed on 21 Apr 2025.
Project details
| Official title | Proposal for Grant of Permission for Approach Road for New Retail Outlet on NH-53 at Km.66+143 (Between Km 66+120 to Km 66+165) on Left Hand Side Block Survey No Na 580/Ap2, Village- Afva, Taluka : Bardoli, District : Surat (0.0045 Ha) |
|---|---|
| Status | Lapsed |
| Status since | 10 Aug 2025 |
| Application filed | 21 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hirenkumar Natvarbhai Mistry |
| Forest land | 50 m² |
| Project cost | ₹1 crore |
| Village / locality | Afva |
| Taluk / tehsil | Bardoli |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12402 |
In context
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Afva, Bardoli, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.2100 ha Protected Forest land for The project of Widening 7.50… — forest land use approved, 2.8 km away
- Diversion of 0.0011 Hectare of Protected Forest land for laying of Proposed… — forest land use approved, 3.1 km away
- Shree Navchetan Kelavani Mandal Connectivitiy — lapsed, 3.1 km away
- Bardoli to Afva to Gotasa to Sarethi to Vankaner to Allu Total length 9/330… — lapsed, 3.3 km away
- Diversion of 0.0337 Ha. of Protected Forest Land I.E. Road Side Strip… — in-principle approval, conditions pending, 3.7 km away
- Permission to lay Optical Fibre Cable from Pardi Kadod Village to Khoj Village… — lapsed, 4.1 km away
- Diversion of Protected Forest Land for the Work of Construction of Proposed… — more information requested, 4.3 km away
- Diversion of 1.6175 Ha Protected forest land for the work of Construction of… — more information requested, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.