Diversion of Protected Forest Land for the Work of Construction of Proposed Four Lane Rob With Approaches in Lieu of Lc No.27 at Railway Km 28/30-32 Between Station Bardoli - Kikakui Road on Station Udhnajalgaon (Bg) Section on Tarsada- Kadod- Bardoli- Sarbhonnavsari Road Km: 33/100 to 75/0

Diversion of Protected Forest Land for the Work of Construction of Proposed Four Lane Rob With Approaches in Lieu of Lc No.27 at Railway Km 28/30-32 Between Station Bardoli - Kikakui Road on Station Udhnajalgaon (Bg) Section on Tarsada- Kadod- Bardoli- Sarbhonnavsari Road Km: 33/100 to 75/0 is a proposed road project in Astan, Bardoli, Surat, Gujarat. The site covers 2.2 acres. Its stated project cost is ₹70 crore. As of 27 Nov 2026, its status is “More information requested” (since 6 Nov 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Protected Forest Land for the Work of Construction of Proposed Four Lane Rob With Approaches in Lieu of Lc No.27 at Railway Km 28/30-32 Between Station Bardoli - Kikakui Road on Station Udhnajalgaon (Bg) Section on Tarsada- Kadod- Bardoli- Sarbhonnavsari Road Km: 33/100 to 75/0 is a proposed road project in Astan, Bardoli, Surat, Gujarat. The site covers 2.2 acres.

Who is building it?

The applicant is Executive Engineer.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Astan, Bardoli, Surat, Gujarat.

How big is it?

It has a stated cost of ₹70 crore; a site of 2.2 acres and 2 acres (0.8 ha) of forest land.

When was it filed?

The application was filed on 28 Apr 2025.

Project details

Official titleProposal for Diversion of Protected Forest Land for the Work of Construction of Proposed Four Lane Rob With Approaches in Lieu of Lc No.27 at Railway Km 28/30-32 Between Station Bardoli - Kikakui Road on Station Udhnajalgaon (Bg) Section on Tarsada- Kadod- Bardoli- Sarbhonnavsari Road Km: 33/100 to 75/0
StatusMore information requested
Status since6 Nov 2026
Application filed28 Apr 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantExecutive Engineer
Land area2.2 acres (0.9 ha)
Forest land2 acres (0.8 ha)
Project cost₹70 crore
Village / localityAstan
Taluk / tehsilBardoli
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12844

In context

59 applications in Surat since January 2022 are in the same category (Roads & highways): 13 approved, 30 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 2.2 acres, this one is smaller than 67% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Astan, Bardoli, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.