What is Developing? Open the mapMap

LapsedTelecom · Aravalli, Gujarat

Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel) Underground Optical fiber cable Line Along the Road side

Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel) Underground Optical fiber cable Line Along the Road side is a lapsed telecom project in Helodar, Malpur, Aravalli, Gujarat. The site covers 0.1 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 23 Oct 2024).

See it on the live map All projects in Aravalli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel) Underground Optical fiber cable Line Along the Road side is a lapsed telecom project in Helodar, Malpur, Aravalli, Gujarat. The site covers 0.1 acres.

Who is building it?

The applicant is Pawan Kumar.

Has it been approved?

No. The application was lapsed on 23 Oct 2024, so it is no longer under consideration.

Where is it?

In Helodar, Malpur, Aravalli, Gujarat.

How big is it?

It has a stated cost of ₹50 lakh; a site of 0.1 acres and 440 m² of forest land.

When was it filed?

The application was filed on 1 Aug 2024.

Project details

Official titleProposal of Reserved Forest Land for Bharti Airtel Limited (Airtel) Underground Optical fiber cable Line Along the Road side in Village:-Katkuva & Helodar in Taluka:-Malpur, District:-Aravalli in Gujarat State. (0.0438 Ha)
StatusLapsed
Status since23 Oct 2024
Application filed1 Aug 2024
Approval soughtForest land use
Application typeNew project
SectorTelecom
ApplicantPawan Kumar
Land area400 m²
Forest land440 m²
Project cost₹50 lakh
Village / localityHelodar
Taluk / tehsilMalpur
DistrictAravalli
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12448

In context

11 applications in Aravalli since January 2022 are in the same category (Telecom): 5 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.1 acres, this one is smaller than 73% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Helodar, Malpur, Aravalli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pawan Kumar in Aravalli

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.