Project details
| Official title | Diversion of 5.1875 Ha. Protected Forest Land of Road Side For Widening and Strengthening of Petlad-Palej-Piplav Road, Km 0/00 to 6/400 ( Working Sec. Km.1/900 to 6/400) in Anand District, Gujarat State. |
|---|---|
| Status | Forest land use approved |
| Status since | 11 Jul 2024 |
| Application filed | 11 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer |
| Forest land | 12.8 acres (5.2 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Palaj |
| Taluk / tehsil | Petlad |
| District | Anand |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12494 |
In context
7 applications in Anand since January 2022 are in the same category (Roads & highways): 3 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Palaj, Petlad, Anand, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : PORDA VILLAGE PIPLAV… — forest land use approved, 2.4 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : PORDA VILLAGE PIPLAV… — lapsed, 2.4 km away
- Diversion of Protected Forest Land for the Project of Four Lanning of Anand… — more information requested, 3 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — forest land use approved, 4.5 km away
- 125/90/63mm Dia MDPE Gas Pipeline Connectivity for Vishnoli, Virol, Sundrana &… — lapsed, 4.5 km away
- 125/90/63mm Dia MDPE Gas Pipeline Connectivity for Vishnoli, Virol, Sundrana &… — forest land use approved, 5.1 km away
- 125 mm & 90 mm PE Gas Pipeline connectivity from Bandhani Chowkdi to Shayona… — forest land use approved, 6.1 km away
- APPLICATION FOR TRANSFER OF EC NO. SEIAA/GUJ/EC/5(f)/152/2022 OBTAINED DATED… — environmental approval granted, 6.7 km away
More from Executive Engineer in Anand
- High Level Bridge across River Mahi on Mujpur Approach Road Ch 3/300 to 4/200,… — lapsed
- Diversion of Protected Forest Land for the Project of Four Lanning of Anand… — more information requested
- Diversion of 2.275 Ha. Protected. Forest Land for Construction New R.O.B on… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.