Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Jan 2026 |
| Application filed | 18 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Jio Digital Fibre Private Limited |
| Land area | 2,100 m² |
| Forest land | 2,120 m² |
| Project cost | ₹5 lakh |
| Village / locality | Piplav |
| Taluk / tehsil | Sojitra |
| District | Anand |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13753 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Sept 2024 (this page) | Forest land use approved | 0.5 acres | ₹5 lakh |
| Change of use filed 17 Mar 2024 | Lapsed | 0.5 acres | ₹5 lakh |
In context
7 applications in Anand since January 2022 are in the same category (Telecom): 3 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Piplav, Sojitra, Anand, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : PORDA VILLAGE PIPLAV… — lapsed, 0 m away
- Diversion of 5.1875 Ha. Protected Forest Land of Road Side For Widening and… — forest land use approved, 2.4 km away
- 125 mm & 90 mm PE Gas Pipeline connectivity from Bandhani Chowkdi to Shayona… — forest land use approved, 3.7 km away
- 125/90/63mm Dia MDPE Gas Pipeline Connectivity for Vishnoli, Virol, Sundrana &… — lapsed, 4.1 km away
- Diversion of Protected Forest Land for the Project of Four Lanning of Anand… — more information requested, 4.4 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — forest land use approved, 4.6 km away
- Proposed project of Fine Chemicals (API & API Intermediates) manufacturing by… — initial checks, 4.8 km away
- Proposed project of Fine Chemicals (API & API Intermediates) manufacturing by… — cleared for impact study, 4.8 km away
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.