Project details
| Official title | Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground Optical fiber cable line Along the Road Side SH-2A Santrampur-Kadana-Limpur Road and Bakor-Pandarvada Road Various Village of Santrampur, Kadana & Khanpur Taluka in District:- Mahisagar in Gujarat State (0.8438 Ha) |
|---|---|
| Status | More information requested |
| Status since | 15 Oct 2025 |
| Application filed | 23 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Pawan Kumar |
| Land area | 2.1 acres (0.8 ha) |
| Forest land | 2.1 acres (0.8 ha) |
| Project cost | ₹1 crore |
| Village / locality | Pandarwada |
| Taluk / tehsil | Khanpur |
| District | Mahisagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12505 |
In context
11 applications in Mahisagar since January 2022 are in the same category (Telecom): 4 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected. At 2.1 acres, this one is larger than 91% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pandarwada, Khanpur, Mahisagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land of Road Side For Widening & Strengthening… — in-principle approval, conditions pending, 2.7 km away
- Diversion of 0.40 Ha. Reserved Forest land for Construction of Hostel Building… — lapsed, 4.5 km away
- Diversion of 0.2070 Ha. Of Reserved forest land for 66 KV Velanwada-Munpur… — in-principle approval, conditions pending, 4.5 km away
- Diversion of 0.9775 Ha. Reserved Forest land for the Construction of New… — forest land use approved, 4.9 km away
- Mahisagar 4G Sat USOF — forest land use approved, 5.7 km away
- Grant permission for the Tourism Activity Kadana Dam (Upper Hill Site),… — more information requested, 6.1 km away
- 110 MW Floating Solar Pv Project at Kadana Dam Reservoir — under forest review, 6.1 km away
- Mahisagar 4G Saturation Revised — lapsed, 6.4 km away
More from Pawan Kumar in Mahisagar
- Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel)… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.