Project details
| Official title | Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel) Underground Optical fiber cable Line Along the Road side in Village:-Munpur, Agarwada, Dedwada Ta.Kadana & Kolambi, Mota Khanpur, Bhadrod, Bamroda, Padedi (Kanod), Dodavanta, Jher & Hansoliyana Muvada Ta.Kadana & Khanpur, District:-Mahisagar in Gujarat State. (0.3537 Ha). |
|---|---|
| Status | More information requested |
| Status since | 8 Apr 2025 |
| Application filed | 22 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Pawan Kumar |
| Land area | 3,600 m² |
| Forest land | 3,540 m² |
| Project cost | ₹1 crore |
| Village / locality | Dodavanta |
| Taluk / tehsil | Khanpur |
| District | Mahisagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13770 |
In context
11 applications in Mahisagar since January 2022 are in the same category (Telecom): 4 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected. At 0.9 acres, this one is larger than 64% of them.
Where it is
Dodavanta, Khanpur, Mahisagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.8723 Ha. Reserved Forest land for the Underground water… — lapsed, 6.5 km away
- Diversion of 2.8284 Ha. Reserved forest land for the U/G Drinking Water… — in-principle approval, conditions pending, 7.9 km away
- Proposal of Forest land for the U/G Rising Main and Internal Water Distributor… — lapsed, 9.6 km away
- Proposal of Reserved forest land for the U/G Drinking Water Pipeline & U/G… — lapsed, 10.2 km away
- Mahisagar 4G Saturation USOF project VVIP Case — forest land use approved, 10.4 km away
- Diversion of 0.2070 Ha. Of Reserved forest land for 66 KV Velanwada-Munpur… — in-principle approval, conditions pending, 10.5 km away
- Diversion of 0.40 Ha. Reserved Forest land for Construction of Hostel Building… — lapsed, 10.5 km away
- Diversion of 0.9775 Ha. Reserved Forest land for the Construction of New… — forest land use approved, 10.5 km away
More from Pawan Kumar in Mahisagar
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.