Project details
| Official title | Construction of Road from Jamsar Chowkdi-Virpur Patia-Shivpur-Mathak -Kadiyana (Morbi - Halvad Highway SH 22) (ROAD-118) (Length = 23.432 Km) |
|---|---|
| Status | More information requested |
| Status since | 5 Oct 2026 |
| Application filed | 2 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer, (R&b) Division Morbi |
| Forest land | 15.2 acres (6.1 ha) |
| Project cost | ₹71 lakh |
| Village / locality | Bhimguda |
| Taluk / tehsil | Wankaner |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14286 |
In context
32 applications in Morbi since January 2022 are in the same category (Roads & highways): 10 approved, 14 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval.
Where it is
Bhimguda, Wankaner, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Kantilal Mohanbhai Desai — environmental approval granted, 5.7 km away
- Shri Kantilal Mohanbhai Desai — environmental approval granted, 5.7 km away
- Laying UG 11 KV Transmission line parallel to Morbi-Halvad Road — forest land use approved, 7.1 km away
- Diversion of 0.002 HA. of PF land for SEGA TILES PVT LTD connectivity Taluka… — in-principle approval, conditions pending, 7.5 km away
- Shri Hasmukhbhai Ambarambhai Patel. Reapprasial ARea-3.22.68Govt land & Survey… — environmental approval granted, 8.3 km away
- Shri Lalit R Bhutiya Lease area - 1.12.30 Ha. — environmental approval granted, 8.3 km away
- Addition of Formaldehyde Based Resin Plant (Phenol, Melamine, Urea & Cardanol-… — under environmental review, 8.9 km away
- Shri Vinodbhai Jethabhai Loria Reapprasial ARea-1.70.42Govt land & Survey no.-… — environmental approval granted, 9.2 km away
More from Executive Engineer, (R&b) Division Morbi in Morbi
- Diversion of Protected Forest Land for Widening of Existing Structures on… — under forest review
- Widening and Strengthening of Existing Halvad - Tikar SH-321 Road (0/00 to… — more information requested
- Widening of Existing Halvad - Tikar Road (SH-321) (0/00 to 18/00 km) Ta.Halvad… — more information requested
- Diversion of Protected Forest Land for Widening of Structures on Palas -… — lapsed
- Diversion of Protected Forest Land for widening of Morbi - Navlakhi Road… — lapsed
- Diversion of 1.06 Ha Protected forest land for the work of Construction of… — forest land use approved